Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Paderborn · Nordrhein-Westfalen · Germany

EV charging stations in Borchen

16 public charging sites with 29 charge points are registered in Borchen, including 14 DC fast-charging points and 14 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Fastned Deutschland GmbH & Co. KG with 8 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites16
Charge points29
DC fast points14
150 kW and up14

Charge points by power

≤ 11 kW3
12–22 kW12
23–49 kW0
50–149 kW0
≥ 150 kW14

Operators

Fastned Deutschland GmbH & Co. KG8
Westfalen Weser Ladeservice GmbH8
Hubertus Schmidt GmbH3
Vattenfall Smarter Living GmbH2
Citywatt GmbH2
Lidl2
Raiffeisen Westfalen Mitte eG2
LandEi Energie GbR1
David Kopecki1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Burgweg 0, 33178 Borchen
    Fastned Deutschland GmbH & Co. KG400 kW4 pointsCCS24/7
    Directions
  • Am Kleeberg 0, 33178 Borchen
    Fastned Deutschland GmbH & Co. KG400 kW4 pointsCCS24/7
    Directions
  • Rudolf-Diesel-Str. 6, 33178 Borchen
    Westfalen Weser Ladeservice GmbH200 kW2 pointsCCS24/7
    Directions
  • Sperenberger Str. 1, 33178 Borchen
    Vattenfall Smarter Living GmbH180 kW2 pointsCCS24/7
    Directions
  • Kirchstr. 28, 33178 Borchen
    Citywatt GmbH180 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Im Mirsch 1, 33178 Borchen
    Hubertus Schmidt GmbH11 kW3 pointsType 2
    Directions
  • Bahnhofstr. 1, 33178 Borchen
    Lidl22 kW2 pointsType 2
    Directions
  • Hauptstraße 5, 33178 Borchen
    Westfalen Weser Ladeservice GmbH22 kW2 pointsType 2
    Directions
  • Bahnhofstr. 5, 33178 Borchen
    Raiffeisen Westfalen Mitte eG22 kW2 pointsType 224/7
    Directions
  • Schloß Hamborn 15, 33178 Borchen
    Westfalen Weser Ladeservice GmbH22 kW2 pointsType 2
    Directions
  • Stadtweg 52, 33178 Borchen
    Westfalen Weser Ladeservice GmbH22 kW2 pointsType 2
    Directions
  • Hinter der Lanfert 1, 33178 Borchen
    LandEi Energie GbR22 kW1 pointsdomestic socket, Type 2
    Directions
  • Leinertsberg 3, 33178 Borchen
    David Kopecki22 kW1 pointsType 2
    Directions

Recently opened

  • 6 Jul 2026 · Kirchstr. 28 · 180 kW · Citywatt GmbH
  • 27 Jun 2026 · Am Kleeberg 0 · 400 kW · Fastned Deutschland GmbH & Co. KG
  • 9 Apr 2026 · Burgweg 0 · 400 kW · Fastned Deutschland GmbH & Co. KG
  • 23 Mar 2026 · Sperenberger Str. 1 · 180 kW · Vattenfall Smarter Living GmbH
  • 20 Aug 2025 · Bahnhofstr. 5 · 22 kW · Raiffeisen Westfalen Mitte eG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET