Day-ahead today06:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Berchtesgadener Land · Bayern · Germany

EV charging stations in Berchtesgaden

37 public charging sites with 56 charge points are registered in Berchtesgaden, including 20 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Energie Südbayern GmbH with 16 charge points; 10 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites37
Charge points56
DC fast points20
150 kW and up16

Charge points by power

≤ 11 kW2
12–22 kW26
23–49 kW0
50–149 kW12
≥ 150 kW16

Operators

Energie Südbayern GmbH16
Servipark Deutschland GmbH10
Tesla Germany GmbH8
Aral Pulse4
E.ON Drive Infrastructure4
Autohaus Brandner GmbH & Co. KG4
Energielösung GmbH4
BK Benzin-Kontor AG2
Buchwinkler Berchtesgaden2
Wirelane GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Bahnhofsplatz 4, 83471 Berchtesgaden
    Aral Pulse300 kW4 pointsCCS
    Directions
  • Bahnhofplatz 2, 83471 Berchtesgaden
    Tesla Germany GmbH250 kW8 pointsCCS
    Directions
  • Bergwerkstr. 12, 83471 Berchtesgaden
    E.ON Drive Infrastructure150 kW4 pointsCCS24/7
    Directions
  • Bergwerkstr. 54, 83471 Berchtesgaden
    Energie Südbayern GmbH50 kW10 pointsCCS, Type 224/7
    Directions
  • Von-Hindenburg-Allee 12, 83471 Berchtesgaden
    BK Benzin-Kontor AG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Bahnhofstr. 19, 83471 Berchtesgaden
    Buchwinkler Berchtesgaden22 kW2 pointsCCS, Type 224/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Salzburger Str. 24, 83471 Berchtesgaden
    Servipark Deutschland GmbH22 kW10 pointsType 224/7
    Directions
  • Salzburger Straße 20, 83471 Berchtesgaden
    Autohaus Brandner GmbH & Co. KG22 kW4 pointsType 2
    Directions
  • Bahnhofstr. 21, 83471 Berchtesgaden
    Energie Südbayern GmbH15 kW4 pointsType 224/7
    Directions
  • Bergwerkstraße 7, 83471 Berchtesgaden
    Energielösung GmbH22 kW2 pointsType 2
    Directions
  • Königsseer Str. 51, 83471 Berchtesgaden
    Energielösung GmbH22 kW2 pointsType 2
    Directions
  • Rathausplatz 81, 83471 Berchtesgaden
    Energie Südbayern GmbH22 kW2 pointsType 224/7
    Directions
  • Buchenhöhe 34, 83471 Berchtesgaden
    Wirelane GmbH11 kW2 pointsType 2
    Directions

Recently opened

  • 13 Aug 2026 · Bahnhofstr. 21 · 15 kW · Energie Südbayern GmbH
  • 31 Mar 2026 · Bergwerkstr. 54 · 50 kW · Energie Südbayern GmbH
  • 9 Oct 2025 · Salzburger Str. 24 · 22 kW · Servipark Deutschland GmbH
  • 8 May 2025 · Buchenhöhe 34 · 11 kW · Wirelane GmbH
  • 19 Jun 2024 · Bergwerkstr. 12 · 150 kW · E.ON Drive Infrastructure

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET