Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Berchtesgadener Land · Bayern · Germany

EV charging stations in Schönau a. Königssee

46 public charging sites with 90 charge points are registered in Schönau a. Königssee, including 8 DC fast-charging points. The most powerful points deliver up to 50 kW.

The largest operator is Energie Südbayern GmbH with 88 charge points; 2 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites46
Charge points90
DC fast points8
150 kW and up0

Charge points by power

≤ 11 kW0
12–22 kW70
23–49 kW0
50–149 kW20
≥ 150 kW0

Operators

Energie Südbayern GmbH88
E.ON Drive GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Jennerbahnstr. 1, 83471 Schönau a. Königssee
    Energie Südbayern GmbH50 kW10 pointsCCS, Type 224/7
    Directions
  • Triftplatz 1, 83471 Schönau a. Königssee
    Energie Südbayern GmbH50 kW10 pointsCCS, Type 224/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Seestr. 3, 83471 Schönau a. Königssee
    Energie Südbayern GmbH22 kW62 pointsType 224/7
    Directions
  • Rathausplatz 1, 83471 Schönau a. Königssee
    Energie Südbayern GmbH22 kW4 pointsType 224/7
    Directions
  • Jennerbahnstraße 18, 83471 Schönau a. Königssee
    E.ON Drive GmbH22 kW2 pointsType 2
    Directions
  • Jennerbahnstr. 18, 83471 Schönau a. Königssee
    Energie Südbayern GmbH22 kW2 pointsType 224/7
    Directions

Recently opened

  • 27 Jul 2026 · Triftplatz 1 · 50 kW · Energie Südbayern GmbH
  • 10 Feb 2026 · Rathausplatz 1 · 22 kW · Energie Südbayern GmbH
  • 19 Dec 2024 · Seestr. 3 · 22 kW · Energie Südbayern GmbH
  • 11 Jul 2023 · Jennerbahnstr. 1 · 50 kW · Energie Südbayern GmbH
  • 2 Aug 2022 · Jennerbahnstr. 18 · 22 kW · Energie Südbayern GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET