Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Kreis Rhein-Erft-Kreis · Nordrhein-Westfalen · Germany

EV charging stations in Bergheim

33 public charging sites with 65 charge points are registered in Bergheim, including 20 DC fast-charging points and 18 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Westenergie Metering GmbH with 14 charge points; 14 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites33
Charge points65
DC fast points20
150 kW and up18

Charge points by power

≤ 11 kW7
12–22 kW36
23–49 kW0
50–149 kW4
≥ 150 kW18

Operators

Westenergie Metering GmbH14
Stadtwerke Erft GmbH12
EnBW mobility+ AG und Co.KG10
Aral Pulse6
Kaufland4
Essergy - Inh. Henning Eßer4
C2 Konzepte GbR4
Allego2
Kohl-Automobile GmbH2
Kreissparkasse Köln2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Fortuna-Nord-Str. 2, 50129 Bergheim
    EnBW mobility+ AG und Co.KG300 kW4 pointsCCS
    Directions
  • Zum Biotop 19, 50127 Bergheim
    EnBW mobility+ AG und Co.KG300 kW2 pointsCCS
    Directions
  • Priamosstr. 1, 50127 Bergheim
    EnBW mobility+ AG und Co.KG200 kW4 pointsCCS
    Directions
  • Peter-Achnitz-Straße 8, 50129 Bergheim
    Aral Pulse150 kW4 pointsCCS
    Directions
  • Humboldtstr. 2, 50126 Bergheim
    Allego150 kW2 pointsCCS24/7
    Directions
  • Dormagener Str. 20, 50129 Bergheim
    Aral Pulse150 kW2 pointsCCS
    Directions
  • Hauptstr. 23, 50126 Bergheim
    Kaufland50 kW4 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Zeiss-Str. 3A, 50126 Bergheim
    Essergy - Inh. Henning Eßer22 kW4 pointsType 2
    Directions
  • Petunienweg 1a, 50127 Bergheim
    C2 Konzepte GbR11 kW4 pointsType 2
    Directions
  • Humboldtstraße 0, 50126 Bergheim
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Bethlehemer Straße 2 a, 50126 Bergheim
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Willy-Brandt-Platz 1, 50126 Bergheim
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Walter-Gropius-Straße 9, 50126 Bergheim
    Stadtwerke Erft GmbH22 kW2 pointsType 2
    Directions
  • Gutenbergstraße 11, 50126 Bergheim
    Stadtwerke Erft GmbH22 kW2 pointsType 2
    Directions
  • Sportparkstraße 14, 50126 Bergheim
    Stadtwerke Erft GmbH22 kW2 pointsType 2
    Directions
  • Heisenbergstraße 20, 50126 Bergheim
    Kohl-Automobile GmbH22 kW2 pointsType 2
    Directions
  • Hauptstraße 21, 50126 Bergheim
    Kreissparkasse Köln22 kW2 pointsType 2
    Directions
  • Kölner Straße 45, 50126 Bergheim
    Stadtwerke Erft GmbH22 kW2 pointsType 2
    Directions
  • Humboldtstraße 4-6, 50126 Bergheim
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Frenser Str. 7, 50127 Bergheim
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Bachstraße 44, 50127 Bergheim
    Stadtwerke Erft GmbH22 kW2 pointsType 2
    Directions
  • Pfarrer-Tirtey-Straße 10, 50129 Bergheim
    Stadtwerke Erft GmbH22 kW2 pointsType 2
    Directions
  • Oberaußemer Str. 20, 50129 Bergheim
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Dormagener Str. 46, 50129 Bergheim
    NEW22 kW2 pointsType 224/7
    Directions
  • Kennedystr. 999, 50129 Bergheim
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Krefelder Straße 4A, 50126 Bergheim
    Carsten Ganser11 kW1 pointsType 2
    Directions
  • Am Feldahorn 4, 50129 Bergheim
    Jörn Kaiser11 kW1 pointsType 2
    Directions
  • Adolf Kolping Straße 19, 50129 Bergheim
    Nancy Wockenfuß11 kW1 pointsType 2
    Directions

Recently opened

  • 5 Jun 2025 · Priamosstr. 1 · 200 kW · EnBW mobility+ AG und Co.KG
  • 23 Apr 2025 · Humboldtstr. 2 · 150 kW · Allego
  • 31 Mar 2025 · Hauptstr. 23 · 50 kW · Kaufland
  • 7 Nov 2024 · Fortuna-Nord-Str. 2 · 300 kW · EnBW mobility+ AG und Co.KG
  • 2 Sept 2024 · Dormagener Str. 20 · 150 kW · Aral Pulse

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET