EV charging stations in Bergheim
33 public charging sites with 65 charge points are registered in Bergheim, including 20 DC fast-charging points and 18 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Westenergie Metering GmbH with 14 charge points; 14 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Fortuna-Nord-Str. 2, 50129 BergheimDirections
- Zum Biotop 19, 50127 BergheimDirections
- Priamosstr. 1, 50127 BergheimDirections
- Peter-Achnitz-Straße 8, 50129 BergheimDirections
- Humboldtstr. 2, 50126 BergheimDirections
- Dormagener Str. 20, 50129 BergheimDirections
- Hauptstr. 23, 50126 BergheimDirections
Other charging sites
AC charge points, sorted by number of points.
- Zeiss-Str. 3A, 50126 BergheimDirections
- Petunienweg 1a, 50127 BergheimDirections
- Humboldtstraße 0, 50126 BergheimDirections
- Bethlehemer Straße 2 a, 50126 BergheimDirections
- Willy-Brandt-Platz 1, 50126 BergheimDirections
- Walter-Gropius-Straße 9, 50126 BergheimDirections
- Gutenbergstraße 11, 50126 BergheimDirections
- Sportparkstraße 14, 50126 BergheimDirections
- Heisenbergstraße 20, 50126 BergheimDirections
- Hauptstraße 21, 50126 BergheimDirections
- Kölner Straße 45, 50126 BergheimDirections
- Humboldtstraße 4-6, 50126 BergheimDirections
- Frenser Str. 7, 50127 BergheimDirections
- Bachstraße 44, 50127 BergheimDirections
- Pfarrer-Tirtey-Straße 10, 50129 BergheimDirections
- Oberaußemer Str. 20, 50129 BergheimDirections
- Dormagener Str. 46, 50129 BergheimDirections
- Kennedystr. 999, 50129 BergheimDirections
- Krefelder Straße 4A, 50126 BergheimDirections
- Am Feldahorn 4, 50129 BergheimDirections
- Adolf Kolping Straße 19, 50129 BergheimDirections
Recently opened
- 5 Jun 2025 · Priamosstr. 1 · 200 kW · EnBW mobility+ AG und Co.KG
- 23 Apr 2025 · Humboldtstr. 2 · 150 kW · Allego
- 31 Mar 2025 · Hauptstr. 23 · 50 kW · Kaufland
- 7 Nov 2024 · Fortuna-Nord-Str. 2 · 300 kW · EnBW mobility+ AG und Co.KG
- 2 Sept 2024 · Dormagener Str. 20 · 150 kW · Aral Pulse
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Data: official national charge point register (1 September 2026). Data sources