EV charging stations in Kerpen
60 public charging sites with 93 charge points are registered in Kerpen, including 39 DC fast-charging points and 33 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Stadtwerke Kerpen GmbH & Co. KG with 34 charge points; 14 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Johannes-Kepler-Str. 1, 50170 KerpenDirections
- Kerpener strasse 150Directions
- Europaring 2, 50170 KerpenDirections
- Kerpener Str. 75Directions
- Stiftsstr. 224, 50171 KerpenDirections
- Heisenbergstraße 2A, 50169 KerpenDirections
- Sindorfer Straße 52, 50171 KerpenDirections
- Sindorfer Str. 65-69, 50171 KerpenDirections
- Kerpener Str. 146-148Directions
Other charging sites
AC charge points, sorted by number of points.
- Jahnplatz 1, 50171 KerpenDirections
- Alte Landstraße 31, 50171 KerpenDirections
- Infantin-Isabella-Straße 3z, 50171 KerpenDirections
- Graf-Berghe-von-Trips-Ring 17, 50169 KerpenDirections
- Höhenweg 39, 50169 KerpenDirections
- Heerstr. 507, 50169 KerpenDirections
- Friedrich-Ebert-Platz 901, 50169 KerpenDirections
- Heerstr. 1-9, 50169 KerpenDirections
- Hubertusweg 11z, 50169 KerpenDirections
- Am Hahnenwall 1z, 50169 KerpenDirections
- Mittelstr. 47z, 50169 KerpenDirections
- Matthias-Werner-Straße 5z, 50169 KerpenDirections
- Hermann Löns Straße 0, 50170 KerpenDirections
- Dieselstr. 17, 50170 KerpenDirections
- Kirchenstraße 28, 50170 KerpenDirections
- Marienstr. 3, 50171 KerpenDirections
- Dürener Str. 275, 50171 KerpenDirections
- Max-Planck-Str. 10-12, 50171 KerpenDirections
- Brüsseler Straße 122, 50171 KerpenDirections
- Europaring 0, 50170 KerpenDirections
- Zum Breitmaar 1, 50170 KerpenDirections
- Am Kuhweg 2, 50170 KerpenDirections
- Bredaer Straße 15, 50171 KerpenDirections
- Zum Breitmmar 2, 50170 KerpenDirections
- Haagstr. 19d, 50171 KerpenDirections
Recently opened
- 31 Oct 2025 · Max-Planck-Str. 10-12 · 22 kW · Stadtwerke Kerpen GmbH & Co. KG
- 19 May 2025 · Europaring 0 · 11 kW · Stadtwerke Kerpen GmbH & Co. KG
- 5 Feb 2025 · Europaring 2 · 150 kW · EWE Go GmbH
- 17 Jan 2025 · Dieselstr. 17 · 22 kW · Stadtwerke Kerpen GmbH & Co. KG
- 1 Dec 2024 · Haagstr. 19d · 11 kW · New Generation Energy UG (haftungsbeschränkt)
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Data: official national charge point register (1 September 2026). Data sources