Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Anhalt-Bitterfeld · Sachsen-Anhalt · Germany

EV charging stations in Bitterfeld-Wolfen

79 public charging sites with 121 charge points are registered in Bitterfeld-Wolfen, including 73 DC fast-charging points and 58 delivering at least 150 kW. The most powerful points deliver up to 350 kW.

The largest operator is Tesla Germany GmbH with 20 charge points; 18 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites79
Charge points121
DC fast points73
150 kW and up58

Charge points by power

≤ 11 kW0
12–22 kW37
23–49 kW0
50–149 kW20
≥ 150 kW64

Operators

Tesla Germany GmbH20
Stadtwerke Bitterfeld-Wolfen GmbH16
TotalEnergies Charging Solutions12
Chemiepark Bitterfeld-Wolfen GmbH12
IONITY GmbH10
Allego10
enercity AG10
EnBW mobility+ AG und Co.KG6
amperio GmbH (DEAMP)4
Steve Bruder4

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Sonnenfeld 2, 06766 Bitterfeld-Wolfen
    IONITY GmbH350 kW10 pointsCCS
    Directions
  • Friedensstr. 75, 06766 Bitterfeld-Wolfen
    Allego300 kW10 pointsCCS24/7
    Directions
  • Anhaltstraße 70, 06749 Bitterfeld-Wolfen
    EnBW mobility+ AG und Co.KG300 kW4 pointsCCS
    Directions
  • Steinfurther Str. 12, 06766 Bitterfeld-Wolfen
    amperio GmbH (DEAMP)300 kW2 pointsCCS24/7
    Directions
  • Leipziger Str. 83-89, 06766 Bitterfeld-Wolfen
    amperio GmbH (DEAMP)300 kW2 pointsCCS
    Directions
  • Sonnenfeld 2, 06766 Bitterfeld-Wolfen
    Tesla Germany GmbH250 kW20 pointsCCS
    Directions
  • Fritz-Weineck-Str. 16, 06766 Bitterfeld-Wolfen
    TotalEnergies Charging Solutions200 kW12 pointsCCS24/7
    Directions
  • Am Sonnenfeld 2, 06766 Bitterfeld-Wolfen
    EnBW mobility+ AG und Co.KG150 kW2 pointsCCS, CHAdeMO
    Directions
  • Lutz-Born-Str. 3, 06766 Bitterfeld-Wolfen
    EWE Go GmbH150 kW2 pointsCCS24/7
    Directions
  • Niels-Bohr-Str. 2, 06749 Bitterfeld-Wolfen
    envia Mitteldeutsche Energie AG100 kW3 pointsCCS, Type 224/7
    Directions
  • Bismarckstr. 39, 06749 Bitterfeld-Wolfen
    Kaufland60 kW3 pointsCCS, Type 224/7
    Directions
  • Zörbiger Str. 22, 06749 Bitterfeld-Wolfen
    Chemiepark Bitterfeld-Wolfen GmbH50 kW6 pointsCCS, CHAdeMO, Type 224/7
    Directions
  • Rudolph-Glauber-Str. 1b, 06749 Bitterfeld-Wolfen
    Chemiepark Bitterfeld-Wolfen GmbH50 kW6 pointsCCS, CHAdeMO, Type 224/7
    Directions
  • Zörbiger Straße 2, 06749 Bitterfeld-Wolfen
    Otto Grimm GmbH&Co.KG50 kW2 pointsCCS, Type 224/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Salegaster Chaussee 1, 06803 Bitterfeld-Wolfen
    enercity AG22 kW10 pointsType 2
    Directions
  • Andresenstraße 1a, 06766 Bitterfeld-Wolfen
    Steve Bruder22 kW4 pointsType 2
    Directions
  • Bahnhofstraße 1, 06749 Bitterfeld-Wolfen
    Stadtwerke Bitterfeld-Wolfen GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Zörbiger Str. 2, 06749 Bitterfeld-Wolfen
    Stadtwerke Bitterfeld-Wolfen GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Zörbiger Str. 49, 06749 Bitterfeld-Wolfen
    DiT Halle22 kW2 pointsType 2
    Directions
  • Friedensstr. 5-7, 06749 Bitterfeld-Wolfen
    Lidl22 kW2 pointsType 2
    Directions
  • Wittenberger Straße 21a, 06749 Bitterfeld-Wolfen
    EDEKA-MIHA Charge GmbH22 kW2 pointsType 2
    Directions
  • Töpferwall 22z, 06749 Bitterfeld-Wolfen
    Stadtwerke Bitterfeld-Wolfen GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Bahnhofstraße 1, 06766 Bitterfeld-Wolfen
    Stadtwerke Bitterfeld-Wolfen GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Rathausplatz 1, 06766 Bitterfeld-Wolfen
    Stadtwerke Bitterfeld-Wolfen GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Robert-Koch-Str. 4, 06766 Bitterfeld-Wolfen
    Stadtwerke Bitterfeld-Wolfen GmbH22 kW2 pointsType 2
    Directions
  • Steinfurther Straße 46, 06766 Bitterfeld-Wolfen
    Stadtwerke Bitterfeld-Wolfen GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Reudener Straße 87, 06766 Bitterfeld-Wolfen
    Stadtwerke Bitterfeld-Wolfen GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Thalheimer Str. 87, 06766 Bitterfeld-Wolfen
    Autohaus Richter GmbH22 kW1 pointsType 224/7
    Directions

Recently opened

  • 28 May 2026 · Steinfurther Str. 12 · 300 kW · amperio GmbH (DEAMP)
  • 3 Nov 2025 · Robert-Koch-Str. 4 · 22 kW · Stadtwerke Bitterfeld-Wolfen GmbH
  • 29 Sept 2025 · Niels-Bohr-Str. 2 · 100 kW · envia Mitteldeutsche Energie AG
  • 7 Aug 2025 · Fritz-Weineck-Str. 16 · 200 kW · TotalEnergies Charging Solutions
  • 12 Jun 2025 · Bismarckstr. 39 · 60 kW · Kaufland

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET