Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Saalekreis · Sachsen-Anhalt · Germany

EV charging stations in Leuna

17 public charging sites with 33 charge points are registered in Leuna, including 11 DC fast-charging points and 7 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is envia Mitteldeutsche Energie AG with 14 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites17
Charge points33
DC fast points11
150 kW and up7

Charge points by power

≤ 11 kW0
12–22 kW14
23–49 kW0
50–149 kW12
≥ 150 kW7

Operators

envia Mitteldeutsche Energie AG14
Aral Pulse6
IKEA Deutschland GmbH & Co.KG4
Stadtwerke Leipzig GmbH4
Stadt Leuna2
Autohaus Rudolph Leuna GmbH2
H2GPL AG1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Nordpark 3, 06237 Leuna
    Aral Pulse300 kW6 pointsCCS
    Directions
  • Leipziger Str. 0, 06237 Leuna
    H2GPL AG200 kW1 pointsCCS24/7
    Directions
  • EKZ Nova 1, 06237 Leuna
    envia Mitteldeutsche Energie AG50 kW12 pointsCCS, CHAdeMO, Type 224/7
    Directions
  • Nordpark 17, 06237 Leuna
    IKEA Deutschland GmbH & Co.KG22 kW4 pointsCCS, CHAdeMO, Type 2
    Directions
  • Friedrich-Ebert-Straße 120, 06237 Leuna
    Autohaus Rudolph Leuna GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Emil-Fischer Straße 3a, 06237 Leuna
    Stadtwerke Leipzig GmbH22 kW4 pointsType 2
    Directions
  • Rudolf-Breitscheid-Str. 18, 06237 Leuna
    envia Mitteldeutsche Energie AG22 kW2 pointsType 224/7
    Directions
  • Emil-Fischer-Straße 22, 06237 Leuna
    Stadt Leuna22 kW2 pointsType 2
    Directions

Recently opened

  • 27 Nov 2025 · Leipziger Str. 0 · 200 kW · H2GPL AG
  • 20 Aug 2024 · Nordpark 3 · 300 kW · Aral Pulse
  • 21 Feb 2021 · Friedrich-Ebert-Straße 120 · 22 kW · Autohaus Rudolph Leuna GmbH
  • 13 Nov 2020 · Emil-Fischer Straße 3a · 22 kW · Stadtwerke Leipzig GmbH
  • 20 Jan 2020 · Emil-Fischer-Straße 22 · 22 kW · Stadt Leuna

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET