Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Ostalbkreis · Baden-Württemberg · Germany

EV charging stations in Bopfingen

12 public charging sites with 26 charge points are registered in Bopfingen, including 5 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is KMF Kunststoff-Metall-Formteile GmbH with 14 charge points; 4 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites12
Charge points26
DC fast points5
150 kW and up4

Charge points by power

≤ 11 kW4
12–22 kW18
23–49 kW0
50–149 kW0
≥ 150 kW4

Operators

KMF Kunststoff-Metall-Formteile GmbH14
EnBW ODR AG8
Shell Deutschland GmbH2
Autohaus Walter Mulfinger GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Bergstraße 13, 73441 Bopfingen
    EnBW ODR AG150 kW2 pointsCCS
    Directions
  • Gewerbehof 16, 73441 Bopfingen
    Shell Deutschland GmbH150 kW2 pointsCCS
    Directions
  • Neue Nördlinger Str. 10, 73441 Bopfingen
    Autohaus Walter Mulfinger GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Postweg 34-40, 73441 Bopfingen
    KMF Kunststoff-Metall-Formteile GmbH22 kW14 pointsType 2
    Directions
  • Bergstr. 4, 73441 Bopfingen
    EnBW ODR AG11 kW4 pointsType 2
    Directions
  • Bachgasse 26, 73441 Bopfingen
    EnBW ODR AG22 kW2 pointsdomestic socket, Type 2
    Directions

Recently opened

  • 28 Nov 2025 · Gewerbehof 16 · 150 kW · Shell Deutschland GmbH
  • 8 Aug 2024 · Bergstr. 4 · 11 kW · EnBW ODR AG
  • 1 Aug 2022 · Postweg 34-40 · 22 kW · KMF Kunststoff-Metall-Formteile GmbH
  • 3 Feb 2022 · Neue Nördlinger Str. 10 · 22 kW · Autohaus Walter Mulfinger GmbH
  • 10 Mar 2021 · Bergstraße 13 · 150 kW · EnBW ODR AG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET