EV charging stations in Bornheim
33 public charging sites with 60 charge points are registered in Bornheim, including 30 DC fast-charging points and 26 delivering at least 150 kW. The most powerful points deliver up to 350 kW.
The largest operator is EnBW mobility+ AG und Co.KG with 18 charge points; 13 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Carl Benz Straße 11, 53332 BornheimDirections
- Bonner Straße 22, 53332 BornheimDirections
- Donnerbachweg 2, 53332 BornheimDirections
- Aarhusweg 1-5, 53332 BornheimDirections
- Bonner Str. 22, 53332 BornheimDirections
- Am Roten Boskoop 2, 53332 BornheimDirections
- Am Hellenkreuz 2, 53332 BornheimDirections
- Alexander-Bell-Str. 1, 53332 BornheimDirections
- Rathausstr. 2, 53332 BornheimDirections
- Donnerbachweg 3, 53332 BornheimDirections
Other charging sites
AC charge points, sorted by number of points.
- Wingert 6, 53332 BornheimDirections
- Peter-Hausmann-Platz 1, 53332 BornheimDirections
- Am Hellenkreuz 5, 53332 BornheimDirections
- Cäsariusweg 5, 53332 BornheimDirections
- Matthias-Claudius-Weg 16, 53332 BornheimDirections
- Mittweidaer Str. 18, 53332 BornheimDirections
- Kantstraße 33, 53332 BornheimDirections
- Klarenhofstraße 44, 53332 BornheimDirections
- Königstr. 49, 53332 BornheimDirections
- Keldenicher Straße 1a, 53332 BornheimDirections
- Robert-Stolz-Straße 30A, 53332 BornheimDirections
- Leo-Koppel-Str. 5, 53332 BornheimDirections
- Münzstraße 18, 53332 BornheimDirections
Recently opened
- 19 May 2026 · Matthias-Claudius-Weg 16 · 22 kW · Wirelane GmbH
- 19 May 2026 · Robert-Stolz-Straße 30A · 22 kW · Wirelane GmbH
- 17 Apr 2026 · Kantstraße 33 · 22 kW · Wirelane GmbH
- 20 Mar 2026 · Mittweidaer Str. 18 · 22 kW · Wirelane GmbH
- 27 Feb 2026 · Cäsariusweg 5 · 22 kW · Wirelane GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Troisdorf 182
- Siegburg 118
- Königswinter 112
- Bad Honnef 74
- Meckenheim 51
- Rheinbach 50
- Niederkassel 43
- Hennef (Sieg) 42
- Lohmar 39
- Sankt Augustin 35
- Hennef 34
Data: official national charge point register (1 September 2026). Data sources