EV charging stations in Niederkassel
22 public charging sites with 43 charge points are registered in Niederkassel, including 15 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is rhenag Rheinische Energie Aktiengesellschaft with 12 charge points; 10 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Feldmühlestr. 22, 53859 NiederkasselDirections
- Feldmühlestr. 24, 53859 NiederkasselDirections
- Lenaustraße 80, 53859 NiederkasselDirections
- Feldmühlestraße 24, 53859 NiederkasselDirections
- Bahnhofstr. 94, 53859 NiederkasselDirections
- Porzer Str. 75, 53859 NiederkasselDirections
Other charging sites
AC charge points, sorted by number of points.
- Johannesstraße 22, 53859 NiederkasselDirections
- Heerstraße 2a, 53859 NiederkasselDirections
- Hauptstraße 0, 53859 NiederkasselDirections
- Rathausplatz 0, 53859 NiederkasselDirections
- Adenauerplatz 0, 53859 NiederkasselDirections
- Willy-Brandt-Platz 0, 53859 NiederkasselDirections
- Kirchstraße 0, 53859 NiederkasselDirections
- Marktstraße 0, 53859 NiederkasselDirections
- Kopernikusstraße 0, 53859 NiederkasselDirections
- Beckergasse 52, 53859 NiederkasselDirections
- Gertrudenweg 11, 53859 NiederkasselDirections
- Friedensstraße 6b, 53859 NiederkasselDirections
Recently opened
- 16 Feb 2026 · Heerstraße 2a · 11 kW · Wirelane GmbH
- 11 Dec 2025 · Feldmühlestr. 22 · 300 kW · Univers Operations GmbH
- 18 Jun 2025 · Feldmühlestr. 24 · 300 kW · EnBW mobility+ AG und Co.KG
- 12 Nov 2024 · Bahnhofstr. 94 · 60 kW · Lidl
- 9 Apr 2024 · Feldmühlestraße 24 · 150 kW · EnBW mobility+ AG und Co.KG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Troisdorf 182
- Siegburg 118
- Königswinter 112
- Bad Honnef 74
- Bornheim 60
- Meckenheim 51
- Rheinbach 50
- Hennef (Sieg) 42
- Lohmar 39
- Sankt Augustin 35
- Hennef 34
Data: official national charge point register (1 September 2026). Data sources