Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis München · Bayern · Germany

EV charging stations in Brunnthal

29 public charging sites with 46 charge points are registered in Brunnthal, including 25 DC fast-charging points and 22 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is EnBW mobility+ AG und Co.KG with 14 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites29
Charge points46
DC fast points25
150 kW and up22

Charge points by power

≤ 11 kW9
12–22 kW11
23–49 kW0
50–149 kW4
≥ 150 kW22

Operators

EnBW mobility+ AG und Co.KG14
Tesla Germany GmbH12
Albert Hauser8
Gemeinde Brunnthal6
Avalon Trust2
Stephanie Robrecht1
Matthias Schreiber1
Ladesäule Hotel Momm1
Harald Ganter1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Zusestraße 1, 85649 Brunnthal
    EnBW mobility+ AG und Co.KG300 kW8 pointsCCS
    Directions
  • Autobahn 0, 85649 Brunnthal
    EnBW mobility+ AG und Co.KG300 kW2 pointsCCS, CHAdeMO
    Directions
  • Zusestraße 7, 85649 Brunnthal
    Tesla Germany GmbH250 kW12 pointsCCS
    Directions
  • Zusestr. 2, 85649 Brunnthal
    EnBW mobility+ AG und Co.KG100 kW2 pointsCCS
    Directions
  • Raststätte Hofoldinger Forst Süd 0, 85649 Brunnthal
    EnBW mobility+ AG und Co.KG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Golfplatz 1, 85649 Brunnthal
    Albert Hauser11 kW6 pointsType 224/7
    Directions
  • Riedhausen 1, 85649 Brunnthal
    Avalon Trust22 kW2 pointsType 2
    Directions
  • Jahnstraße 2, 85649 Brunnthal
    Gemeinde Brunnthal22 kW2 pointsType 2
    Directions
  • St.-Georg-Str. 3, 85649 Brunnthal
    Albert Hauser22 kW2 pointsType 224/7
    Directions
  • Glonner Str 3, 85649 Brunnthal
    Gemeinde Brunnthal22 kW2 pointsType 2
    Directions
  • Münchner Straße 5, 85649 Brunnthal
    Gemeinde Brunnthal22 kW2 pointsType 2
    Directions
  • Auenstraße 18, 85649 Brunnthal
    Stephanie Robrecht16 kW1 pointsType 2
    Directions
  • Maurerweg 12, 85649 Brunnthal
    Matthias Schreiber11 kW1 pointsType 2
    Directions
  • Hauptstr. 14, 85649 Brunnthal
    Ladesäule Hotel Momm11 kW1 pointsType 224/7
    Directions
  • Maurerweg 12A, 85649 Brunnthal
    Harald Ganter11 kW1 pointsType 2
    Directions

Recently opened

  • 24 Jul 2025 · Zusestr. 2 · 100 kW · EnBW mobility+ AG und Co.KG
  • 1 Jul 2024 · Am Golfplatz 1 · 11 kW · Albert Hauser
  • 1 Jan 2024 · Auenstraße 18 · 16 kW · Stephanie Robrecht
  • 1 Jan 2024 · Maurerweg 12 · 11 kW · Matthias Schreiber
  • 20 Mar 2023 · Zusestraße 7 · 250 kW · Tesla Germany GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET