EV charging stations in Ismaning
46 public charging sites with 71 charge points are registered in Ismaning, including 10 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Energielösung GmbH with 28 charge points; 12 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Robert-Bürkle-Straße 15, 85737 IsmaningDirections
- Robert-Bürkle-Str. 14, 85737 IsmaningDirections
- Münchener Str. 57, 85737 IsmaningDirections
- Osterfeldstr. 39, 85737 IsmaningDirections
- Gutenbrgstraße 10, 85737 IsmaningDirections
Other charging sites
AC charge points, sorted by number of points.
- Oskar Messter Straße 20, 85737 IsmaningDirections
- An der Torfbahn 2, 85737 IsmaningDirections
- Bahnhofplatz 5, 85737 IsmaningDirections
- Münchener Str. 101, 85737 IsmaningDirections
- Steinheilstr. 4-8, 85737 IsmaningDirections
- Wallbergweg 16, 85737 IsmaningDirections
- Kirchplatz 5, 85737 IsmaningDirections
- Schloßstr. 7, 85737 IsmaningDirections
- Schloßstraße 7, 85737 IsmaningDirections
- Erich-Zeitler-Straße 8, 85737 IsmaningDirections
- Gutenbergstraße 10, 85737 IsmaningDirections
- Robert-Bürkle-Str. 15, 85737 IsmaningDirections
- Korbinianstraße 16, 85737 IsmaningDirections
- Mühlenstr. 20, 85737 IsmaningDirections
- Unterföhringer Str. 21, 85737 IsmaningDirections
- Bajuwarenstr. 47, 85737 IsmaningDirections
- Seidl-Kreuz-Weg 78, 85737 IsmaningDirections
- Freisinger Str. 83, 85737 IsmaningDirections
- Senderstr. 57, 85737 IsmaningDirections
- Oskar Messter Straße 20, 85738 IsmaningDirections
- Oskar Messter Straße 20, 85739 IsmaningDirections
- Oskar Messter Straße 20, 85740 IsmaningDirections
- Oskar Messter Straße 20, 85741 IsmaningDirections
- Oskar Messter Straße 20, 85742 IsmaningDirections
Recently opened
- 22 Apr 2026 · Senderstr. 57 · 22 kW · Wattif Europe GmbH
- 12 Jan 2026 · Mühlenstr. 20 · 22 kW · Energielösung GmbH
- 12 Jan 2026 · Unterföhringer Str. 21 · 22 kW · Energielösung GmbH
- 12 Jan 2026 · Seidl-Kreuz-Weg 78 · 22 kW · Energielösung GmbH
- 11 Nov 2025 · Bajuwarenstr. 47 · 22 kW · Energielösung GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Unterschleißheim 163
- Unterföhring 105
- Garching 100
- Aschheim 77
- Haar 66
- Unterhaching 66
- Oberschleißheim 62
- Putzbrunn 50
- Taufkirchen 48
- Brunnthal 46
- Feldkirchen 46
- Grünwald 45
Data: official national charge point register (1 September 2026). Data sources