Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Mainz-Bingen · Rheinland-Pfalz · Germany

EV charging stations in Budenheim

46 public charging sites with 92 charge points are registered in Budenheim, including 2 DC fast-charging points. The most powerful points deliver up to 50 kW.

The largest operator is Parkplatz Golfplatz with 48 charge points; 3 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites46
Charge points92
DC fast points2
150 kW and up0

Charge points by power

≤ 11 kW48
12–22 kW42
23–49 kW2
50–149 kW0
≥ 150 kW0

Operators

Parkplatz Golfplatz48
Mainzer Golfclub30
eCharge Budenheim GmbH14

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Luisenstr. 7, 55257 Budenheim
    eCharge Budenheim GmbH49.9 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Budenheimer Parkallee 11
    Parkplatz Golfplatz11 kW48 pointsType 2
    Directions
  • Budenheimer Parkallee 11
    Mainzer Golfclub22 kW30 pointsType 2
    Directions
  • An der Waldsporthalle 0, 55257 Budenheim
    eCharge Budenheim GmbH22 kW2 pointsType 2
    Directions
  • Schulstraße 0, 55257 Budenheim
    eCharge Budenheim GmbH22 kW2 pointsType 2
    Directions
  • Finther Str. 0, 55257 Budenheim
    eCharge Budenheim GmbH22 kW2 pointsType 224/7
    Directions
  • Berliner Straße 3, 55257 Budenheim
    eCharge Budenheim GmbH22 kW2 pointsType 2
    Directions
  • Budenheimer Parkallee 5
    eCharge Budenheim GmbH22 kW2 pointsType 2
    Directions
  • Untere Stefanstraße 65, 55257 Budenheim
    eCharge Budenheim GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 18 Aug 2026 · Finther Str. 0 · 22 kW · eCharge Budenheim GmbH
  • 12 May 2026 · Luisenstr. 7 · 49.9 kW · eCharge Budenheim GmbH
  • 29 Dec 2023 · Budenheimer Parkallee 11 · 22 kW · Mainzer Golfclub
  • 18 Dec 2023 · Budenheimer Parkallee 11 · 11 kW · Parkplatz Golfplatz
  • 17 Feb 2022 · An der Waldsporthalle 0 · 22 kW · eCharge Budenheim GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET