Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Groß-Gerau · Hessen · Germany

EV charging stations in Büttelborn

21 public charging sites with 40 charge points are registered in Büttelborn, including 17 DC fast-charging points and 14 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Überlandwerk Groß-Gerau GmbH with 12 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites21
Charge points40
DC fast points17
150 kW and up14

Charge points by power

≤ 11 kW0
12–22 kW22
23–49 kW0
50–149 kW2
≥ 150 kW16

Operators

Überlandwerk Groß-Gerau GmbH12
Shell Deutschland GmbH10
Entega Plus GmbH8
EnBW mobility+ AG und Co.KG4
Richter+Frenzel GmbH + Co. KG4
Mainzer Stadtwerke AG2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Im Mehlsee 5, 64572 Büttelborn
    Shell Deutschland GmbH300 kW10 pointsCCS, CHAdeMO
    Directions
  • Im Mehlsee 1-5, 64572 Büttelborn
    Entega Plus GmbH150 kW4 pointsCCS, CHAdeMO, Type 2
    Directions
  • BAB67, Autobahnraststätte Büttelborn Süd 0
    EnBW mobility+ AG und Co.KG150 kW2 pointsCCS24/7
    Directions
  • Raststätte Büttelborn Süd 0
    EnBW mobility+ AG und Co.KG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • An der Trift 22, 64572 Büttelborn
    Überlandwerk Groß-Gerau GmbH22 kW4 pointsType 224/7
    Directions
  • Hessenring 25, 64572 Büttelborn
    Richter+Frenzel GmbH + Co. KG22 kW4 pointsType 2
    Directions
  • Erich-Kästner-Str. 0, 64572 Büttelborn
    Überlandwerk Groß-Gerau GmbH22 kW2 pointsType 2
    Directions
  • Fichtering 0, 64572 Büttelborn
    Überlandwerk Groß-Gerau GmbH22 kW2 pointsType 2
    Directions
  • Kirchstr. 1, 64572 Büttelborn
    Entega Plus GmbH22 kW2 pointsType 224/7
    Directions
  • Mainzer Str. 13, 64572 Büttelborn
    Mainzer Stadtwerke AG22 kW2 pointsType 2
    Directions
  • Schillerstr. 28, 64572 Büttelborn
    Überlandwerk Groß-Gerau GmbH22 kW2 pointsType 2
    Directions
  • Hermann-Schmitt Straße 36, 64572 Büttelborn
    Entega Plus GmbH22 kW2 pointsType 2
    Directions
  • Waldstr. 1A, 64572 Büttelborn
    Überlandwerk Groß-Gerau GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 27 May 2026 · BAB67, Autobahnraststätte Büttelborn Süd 0 · 150 kW · EnBW mobility+ AG und Co.KG
  • 27 Mar 2026 · Im Mehlsee 5 · 300 kW · Shell Deutschland GmbH
  • 19 Feb 2026 · Kirchstr. 1 · 22 kW · Entega Plus GmbH
  • 27 May 2024 · An der Trift 22 · 22 kW · Überlandwerk Groß-Gerau GmbH
  • 2 Apr 2024 · Hessenring 25 · 22 kW · Richter+Frenzel GmbH + Co. KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET