Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Schwandorf · Bayern · Germany

EV charging stations in Burglengenfeld

19 public charging sites with 31 charge points are registered in Burglengenfeld, including 16 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is REWAG KG with 8 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites19
Charge points31
DC fast points16
150 kW and up8

Charge points by power

≤ 11 kW2
12–22 kW12
23–49 kW0
50–149 kW8
≥ 150 kW9

Operators

REWAG KG8
Allego6
EnBW mobility+ AG und Co.KG5
MER Germany4
Comfort Charge2
EWE Go GmbH2
ALDI SÜD2
Mario Leikam2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Im Naabtalpark 46, 93133 Burglengenfeld
    EnBW mobility+ AG und Co.KG300 kW5 pointsCCS, Type 2
    Directions
  • Kapitän-Lehmann-Straße 5, 93133 Burglengenfeld
    Comfort Charge200 kW2 pointsCCS
    Directions
  • Regensburger Str. 66, 93133 Burglengenfeld
    EWE Go GmbH150 kW2 pointsCCS24/7
    Directions
  • Am Rodinger Berg 1, 93133 Burglengenfeld
    Allego50 kW6 pointsCCS24/7
    Directions
  • Regensburger Str. 62, 93133 Burglengenfeld
    ALDI SÜD50 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Im Naabtalpark 54, 93133 Burglengenfeld
    REWAG KG22 kW6 pointsType 224/7
    Directions
  • Pfarrer-Bock-Str. 0, 93133 Burglengenfeld
    REWAG KG22 kW2 pointsType 2
    Directions
  • Johannes-Kepler-Str. 4, 93133 Burglengenfeld
    MER Germany22 kW2 pointsType 224/7
    Directions
  • Im Naabtalpark 50, 93133 Burglengenfeld
    MER Germany22 kW2 pointsType 224/7
    Directions
  • Pestalozzistraße 9, 93133 Burglengenfeld
    Mario Leikam11 kW2 pointsType 2
    Directions

Recently opened

  • 15 Apr 2025 · Regensburger Str. 62 · 50 kW · ALDI SÜD
  • 12 Aug 2024 · Am Rodinger Berg 1 · 50 kW · Allego
  • 16 Jul 2024 · Johannes-Kepler-Str. 4 · 22 kW · MER Germany
  • 11 Jul 2024 · Im Naabtalpark 50 · 22 kW · MER Germany
  • 3 Jul 2024 · Im Naabtalpark 46 · 300 kW · EnBW mobility+ AG und Co.KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET