Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Schwandorf · Bayern · Germany

EV charging stations in Wernberg-Köblitz

33 public charging sites with 51 charge points are registered in Wernberg-Köblitz, including 43 DC fast-charging points and 42 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is EnBW mobility+ AG und Co.KG with 14 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites33
Charge points51
DC fast points43
150 kW and up42

Charge points by power

≤ 11 kW0
12–22 kW5
23–49 kW0
50–149 kW2
≥ 150 kW44

Operators

EnBW mobility+ AG und Co.KG14
Tesla Germany GmbH10
Shell Deutschland GmbH8
IONITY GmbH6
Merdedes-Benz High Power Charging Network6
Energielösung GmbH4
Allego2
Charge Construct GmbH1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Keplerstr. 1, 92533 Wernberg-Köblitz
    Shell Deutschland GmbH400 kW8 pointsCCS
    Directions
  • Wernberg-Köblitz 0
    IONITY GmbH350 kW4 pointsCCS
    Directions
  • Keplerstraße 1, 92533 Wernberg-Köblitz
    IONITY GmbH350 kW2 pointsCCS
    Directions
  • Klaus-Conrad-Straße 7, 92533 Wernberg-Köblitz
    EnBW mobility+ AG und Co.KG300 kW14 pointsCCS, CHAdeMO, Type 2
    Directions
  • Keplerstraße 1, 92533 Wernberg-Köblitz
    Tesla Germany GmbH250 kW10 pointsCCS
    Directions
  • Keplerstr. 1, 92533 Wernberg-Köblitz
    Merdedes-Benz High Power Charging Network200 kW6 pointsCCS24/7
    Directions
  • Klaus-Conrad-Straße 2A, 92533 Wernberg-Köblitz
    Allego50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Pfarrer-Schreyer-Str. 17, 92533 Wernberg-Köblitz
    Energielösung GmbH22 kW4 pointsType 224/7
    Directions
  • Klaus-Conrad-Straße 3, 92533 Wernberg-Köblitz
    Charge Construct GmbH22 kW1 pointsType 2
    Directions

Recently opened

  • 15 Aug 2025 · Keplerstr. 1 · 400 kW · Shell Deutschland GmbH
  • 26 Jun 2025 · Pfarrer-Schreyer-Str. 17 · 22 kW · Energielösung GmbH
  • 28 May 2025 · Keplerstr. 1 · 200 kW · Merdedes-Benz High Power Charging Network
  • 4 Jul 2023 · Keplerstraße 1 · 250 kW · Tesla Germany GmbH
  • 11 Apr 2023 · Keplerstraße 1 · 350 kW · IONITY GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET