Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Eichstätt · Bayern · Germany

EV charging stations in Denkendorf (Eichstätt)

21 public charging sites with 41 charge points are registered in Denkendorf (Eichstätt), including 19 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Tank & Rast Entwicklungsgesellschaft mbH with 14 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites21
Charge points41
DC fast points19
150 kW and up16

Charge points by power

≤ 11 kW0
12–22 kW17
23–49 kW0
50–149 kW8
≥ 150 kW16

Operators

Tank & Rast Entwicklungsgesellschaft mbH14
N-ERGIE Aktiengesellschaft14
HG GmbH10
W. Landes KG2
Hotel Sonnenhang Gästehaus1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Bajuwarenstr. 2, 85095 Denkendorf
    Tank & Rast Entwicklungsgesellschaft mbH300 kW14 pointsCCS24/7
    Directions
  • Alemannenstr. 14, 85095 Denkendorf
    HG GmbH150 kW2 pointsCCS24/7
    Directions
  • Alemanenstrasse 14, 85095 Denkendorf
    HG GmbH50 kW8 pointsCCS, Type 2
    Directions
  • Riedenburger Str. 5, 85095 Denkendorf
    Hotel Sonnenhang Gästehaus22 kW1 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Hauptstr. 0, 85095 Denkendorf
    N-ERGIE Aktiengesellschaft22 kW14 pointsType 2
    Directions
  • Hauptstr. 14, 85095 Denkendorf
    W. Landes KG22 kW2 pointsType 2
    Directions

Recently opened

  • 25 Feb 2026 · Bajuwarenstr. 2 · 300 kW · Tank & Rast Entwicklungsgesellschaft mbH
  • 7 Oct 2025 · Hauptstr. 0 · 22 kW · N-ERGIE Aktiengesellschaft
  • 10 Apr 2024 · Alemannenstr. 14 · 150 kW · HG GmbH
  • 28 Mar 2024 · Riedenburger Str. 5 · 22 kW · Hotel Sonnenhang Gästehaus
  • 12 Aug 2022 · Hauptstr. 14 · 22 kW · W. Landes KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET