EV charging stations in Falkensee
28 public charging sites with 55 charge points are registered in Falkensee, including 21 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is ubitricity Gesellschaft für verteilte Energiesysteme mbH with 22 charge points; 11 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Seegefelder Str. 148, 14612 FalkenseeDirections
- Spandauer Str. 109, 14612 FalkenseeDirections
- Nauener Str. 80, 14612 FalkenseeDirections
- Scharenbergstr. 16, 14612 FalkenseeDirections
- Straße der Einheit 138 a, 14612 FalkenseeDirections
Other charging sites
AC charge points, sorted by number of points.
- Scharenbergstraße 2, 14612 FalkenseeDirections
- Seegefelder Straße bei 144, 14612 FalkenseeDirections
- Karl-Marx-Straße 1, 14612 FalkenseeDirections
- Hansastraße 8, 14612 FalkenseeDirections
- Potsdamer Straße 15, 14612 FalkenseeDirections
- Poststr. 31, 14612 FalkenseeDirections
- Berliner Straße 36, 14612 FalkenseeDirections
- Poststr. 40, 14612 FalkenseeDirections
- Adlerstraße 50, 14612 FalkenseeDirections
- Falkenhagener Straße 43 - 49, 14612 FalkenseeDirections
- Potsdamer Straße 0, 14612 FalkenseeDirections
- Templiner Straße 4, 14612 FalkenseeDirections
- Fischerstr. 37, 14612 FalkenseeDirections
- Schwarzwildweg 87, 14612 FalkenseeDirections
Recently opened
- 5 Mar 2026 · Seegefelder Str. 148 · 400 kW · Eviny
- 9 Dec 2025 · Nauener Str. 80 · 180 kW · Vattenfall Smarter Living GmbH
- 21 Nov 2024 · Seegefelder Straße bei 144 · 22 kW · ubitricity Gesellschaft für verteilte Energiesysteme mbH
- 14 Jun 2024 · Scharenbergstraße 2 · 22 kW · ubitricity Gesellschaft für verteilte Energiesysteme mbH
- 3 Apr 2024 · Potsdamer Straße 15 · 22 kW · ubitricity Gesellschaft für verteilte Energiesysteme mbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Wustermark 77
- Dallgow-Döberitz 51
- Nauen 40
- Rathenow 26
Data: official national charge point register (1 September 2026). Data sources