Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Waldeck-Frankenberg · Hessen · Germany

EV charging stations in Frankenberg

37 public charging sites with 61 charge points are registered in Frankenberg, including 20 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 200 kW.

The largest operator is Stadtwerke Frankenberg GmbH with 17 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites37
Charge points61
DC fast points20
150 kW and up10

Charge points by power

≤ 11 kW8
12–22 kW33
23–49 kW0
50–149 kW10
≥ 150 kW10

Operators

Stadtwerke Frankenberg GmbH17
EWE Go GmbH14
Wattif Europe GmbH9
Kunststofftechnik Glittenberg GmbH8
EnergieGesellschaft Frankenberg mbH5
TEAG Mobil GmbH4
E-Merge Mobility GmbH2
Lidl2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Jahnstr. 13, 35066 Frankenberg
    Stadtwerke Frankenberg GmbH200 kW2 pointsCCS24/7
    Directions
  • Ruhrstraße 17, 35066 Frankenberg
    EWE Go GmbH160 kW2 pointsCCS
    Directions
  • Am Grün 9, 35066 Frankenberg
    TEAG Mobil GmbH150 kW4 pointsCCS24/7
    Directions
  • Am Grün 22, 35066 Frankenberg
    Stadtwerke Frankenberg GmbH150 kW2 pointsCCS24/7
    Directions
  • Siegener Str. 5, 35066 Frankenberg
    EWE Go GmbH50 kW8 pointsCCS24/7
    Directions
  • Marburger Str. 23, 35066 Frankenberg
    E-Merge Mobility GmbH50 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Goldbachstraße 10, 35066 Frankenberg
    Kunststofftechnik Glittenberg GmbH11 kW8 pointsType 2
    Directions
  • Untermarkt 0, 35066 Frankenberg
    Wattif Europe GmbH22 kW6 pointsType 224/7
    Directions
  • Siegener Straße 24, 35066 Frankenberg
    EnergieGesellschaft Frankenberg mbH22 kW5 pointsType 2
    Directions
  • Röddenauer Str. 2, 35066 Frankenberg
    EWE Go GmbH22 kW4 pointsType 224/7
    Directions
  • Siegener Str. 5, 35066 Frankenberg
    Lidl22 kW2 pointsType 2
    Directions
  • Obermarkt 7, 35066 Frankenberg
    Stadtwerke Frankenberg GmbH22 kW2 pointsType 224/7
    Directions
  • Forststr. 9, 35066 Frankenberg
    Stadtwerke Frankenberg GmbH22 kW2 pointsType 224/7
    Directions
  • Hainstr. 13, 35066 Frankenberg
    Stadtwerke Frankenberg GmbH22 kW2 pointsType 224/7
    Directions
  • Am Bahnhof 6-14, 35066 Frankenberg
    Stadtwerke Frankenberg GmbH22 kW2 pointsType 224/7
    Directions
  • Illersteg -, 35066 Frankenberg
    Stadtwerke Frankenberg GmbH22 kW2 pointsType 224/7
    Directions
  • Bahnhofstr. 17-19, 35066 Frankenberg
    Stadtwerke Frankenberg GmbH22 kW2 pointsType 224/7
    Directions
  • Untergasse 0, 35066 Frankenberg
    Wattif Europe GmbH22 kW2 pointsType 224/7
    Directions
  • Auf der Burg 16, 35066 Frankenberg
    Stadtwerke Frankenberg GmbH22 kW1 pointsType 224/7
    Directions
  • Untergasse 19, 35066 Frankenberg
    Wattif Europe GmbH22 kW1 pointsType 224/7
    Directions

Recently opened

  • 18 Dec 2025 · Illersteg - · 22 kW · Stadtwerke Frankenberg GmbH
  • 18 Dec 2025 · Auf der Burg 16 · 22 kW · Stadtwerke Frankenberg GmbH
  • 24 Sept 2025 · Untermarkt 0 · 22 kW · Wattif Europe GmbH
  • 6 Jun 2025 · Am Grün 9 · 150 kW · TEAG Mobil GmbH
  • 22 May 2025 · Untergasse 19 · 22 kW · Wattif Europe GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET