EV charging stations in Willingen (Upland)
31 public charging sites with 57 charge points are registered in Willingen (Upland), including 10 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Regioladen+ with 30 charge points; 7 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Mühlenkopfstr. 12, 34508 Willingen (Upland)Directions
- Am Hagen 9, 34508 Willingen (Upland)Directions
- Zur Hoppecke 6, 34508 Willingen (Upland)Directions
Other charging sites
AC charge points, sorted by number of points.
- Kneippweg 1, 34508 Willingen (Upland)Directions
- Am Hagen 7, 34508 Willingen (Upland)Directions
- Am Köhlerhagen 3, 34508 Willingen (Upland)Directions
- Zum Treis 10, 34508 Willingen (Upland)Directions
- Auf dem Wakenfeld 1, 34508 Willingen (Upland)Directions
- Zur Mühlenkopfschanze 1, 34508 Willingen (Upland)Directions
- In den Kämpen 2, 34508 Willingen (Upland)Directions
- Zur Ruthenaar 3, 34508 Willingen (Upland)Directions
- Sportstraße 4, 34508 Willingen (Upland)Directions
- Zur Hoppecke 5, 34508 Willingen (Upland)Directions
- Zum Hohen Eimberg 12, 34508 Willingen (Upland)Directions
- Waldecker Straße 27, 34508 Willingen (Upland)Directions
- Sonnenweg 4a, 34508 Willingen (Upland)Directions
- Zum Kurgarten 8a, 34508 Willingen (Upland)Directions
- Uplandstraße 2, 34508 Willingen (Upland)Directions
- Korbacher Str. 4, 34508 Willingen (Upland)Directions
Recently opened
- 13 Jul 2026 · Zum Hohen Eimberg 12 · 22 kW · Regioladen+
- 5 May 2026 · Am Hagen 9 · 200 kW · Regioladen+
- 30 Jan 2026 · Am Hagen 7 · 22 kW · NOVATAS GmbH & Co. KG
- 9 Dec 2025 · Zum Treis 10 · 11 kW · Dayser Deutschland GmbH
- 19 Nov 2025 · Mühlenkopfstr. 12 · 300 kW · EAM Natur Energie GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Bad Wildungen 83
- Frankenberg 61
- Diemelstadt 47
- Korbach 44
Data: official national charge point register (1 September 2026). Data sources