EV charging stations in Gevelsberg

18 public charging sites with 37 charge points are registered in Gevelsberg, including 18 DC fast-charging points and 14 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is AVU AG with 16 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites18
Charge points37
DC fast points18
150 kW and up14

Charge points by power

≤ 11 kW0
12–22 kW16
23–49 kW0
50–149 kW7
≥ 150 kW14

Operators

AVU AG16
EWE Go HOCHTIEF Ladepartner GmbH & Co. KG12
Mader Frischecenter KG4
Lidl3
Westfalen AG & Co. KG2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • An der Drehbank 4, 58285 Gevelsberg
    EWE Go HOCHTIEF Ladepartner GmbH & Co. KG400 kW12 pointsCCS24/7
    Directions
  • Wittener Str. 19, 58285 Gevelsberg
    Westfalen AG & Co. KG150 kW2 pointsCCS24/7
    Directions
  • Rosendahler Str. 44, 58285 Gevelsberg
    Lidl60 kW3 pointsCCS, Type 2
    Directions
  • Wittener Straße 140, 58285 Gevelsberg
    Mader Frischecenter KG50 kW4 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • An der Drehbank 18, 58285 Gevelsberg
    AVU AG22 kW6 pointsType 224/7
    Directions
  • Weststraße 1, 58285 Gevelsberg
    AVU AG22 kW2 pointsType 2
    Directions
  • Mittelstraße 2, 58285 Gevelsberg
    AVU AG22 kW2 pointsType 2
    Directions
  • Großer Markt 2, 58285 Gevelsberg
    AVU AG22 kW2 pointsType 2
    Directions
  • Am Waldesrand 11, 58285 Gevelsberg
    AVU AG22 kW2 pointsType 2
    Directions
  • Ochsenkamp 59, 58285 Gevelsberg
    AVU AG22 kW2 pointsType 2
    Directions

Recently opened

  • 23 Jul 2026 · Wittener Str. 19 · 150 kW · Westfalen AG & Co. KG
  • 11 Nov 2025 · An der Drehbank 4 · 400 kW · EWE Go HOCHTIEF Ladepartner GmbH & Co. KG
  • 28 Nov 2024 · Rosendahler Str. 44 · 60 kW · Lidl
  • 3 Feb 2023 · Wittener Straße 140 · 50 kW · Mader Frischecenter KG
  • 25 Jan 2022 · Weststraße 1 · 22 kW · AVU AG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET