Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Roth · Bayern · Germany

EV charging stations in Greding

31 public charging sites with 42 charge points are registered in Greding, including 35 DC fast-charging points and 30 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Tesla Germany GmbH with 20 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites31
Charge points42
DC fast points35
150 kW and up30

Charge points by power

≤ 11 kW0
12–22 kW6
23–49 kW0
50–149 kW6
≥ 150 kW30

Operators

Tesla Germany GmbH20
EnBW mobility+ AG und Co.KG6
EWE Go GmbH6
N-ERGIE Aktiengesellschaft4
E.ON Drive Infrastructure2
E.ON Drive GmbH2
Auto Bierschneider GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • An der Autobahn 9, 91171 Greding
    EnBW mobility+ AG und Co.KG300 kW2 pointsCCS, CHAdeMO
    Directions
  • Kraftsbucher Str. 10, 91171 Greding
    Tesla Germany GmbH250 kW20 pointsCCS
    Directions
  • An der Autobahn 4, 91171 Greding
    EWE Go GmbH225 kW6 pointsCCS
    Directions
  • Bahnhofstr. 20, 91171 Greding
    EnBW mobility+ AG und Co.KG150 kW2 pointsCCS
    Directions
  • Raststätte Greding West 0
    EnBW mobility+ AG und Co.KG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Raststätte Greding Ost 0
    E.ON Drive Infrastructure50 kW2 pointsCCS
    Directions
  • Greding Ost 0
    E.ON Drive GmbH50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Industriestraße 2, 91171 Greding
    Auto Bierschneider GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Hallenbad 8, 91171 Greding
    N-ERGIE Aktiengesellschaft22 kW2 pointsType 2
    Directions
  • Marktplatz 11 - 13, 91171 Greding
    N-ERGIE Aktiengesellschaft22 kW2 pointsType 2
    Directions

Recently opened

  • 14 Dec 2023 · Raststätte Greding Ost 0 · 50 kW · E.ON Drive Infrastructure
  • 13 Jun 2023 · An der Autobahn 4 · 225 kW · EWE Go GmbH
  • 5 Apr 2023 · Kraftsbucher Str. 10 · 250 kW · Tesla Germany GmbH
  • 21 Feb 2021 · Industriestraße 2 · 22 kW · Auto Bierschneider GmbH
  • 11 Dec 2020 · Greding Ost 0 · 50 kW · E.ON Drive GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET