EV charging stations in Roth
28 public charging sites with 57 charge points are registered in Roth, including 8 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Energie Service GmbH der Stadtwerke Roth with 32 charge points; 9 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Nürnberger Str. 41, 91154 RothDirections
- Ostring 6, 91154 RothDirections
- Friedrich-Wambsganz-Str. 1, 91154 RothDirections
- GewerbegebietI 0, 91154 RothDirections
Other charging sites
AC charge points, sorted by number of points.
- Birkacher Hauptstr. 2, 91154 RothDirections
- Adlerstr. 10, 91154 RothDirections
- Ostring 14, 91154 RothDirections
- Ohmstr. 37, 91154 RothDirections
- Belmbracher Str. -, 91154 RothDirections
- Norrisstr. 31, 91154 RothDirections
- Weinbergweg 0, 91154 RothDirections
- Otto-Schrimpff-Straße 0, 91154 RothDirections
- Veit-Stoß-Straße 0, 91154 RothDirections
- Willy-Supf-Platz 1, 91154 RothDirections
- Grimmstr. 1, 91154 RothDirections
- Bortenmacherstraße 4, 91154 RothDirections
- Gildestr. 5, 91154 RothDirections
- Stieberstraße 7, 91154 RothDirections
- Sandgasse 23, 91154 RothDirections
- Brentwoodstr. 37, 91154 RothDirections
- Friedrich-Ebert-Straße 40, 91154 RothDirections
- Gildestraße 5, 91154 RothDirections
Recently opened
- 17 Dec 2025 · Grimmstr. 1 · 22 kW · Energie Service GmbH der Stadtwerke Roth
- 4 Dec 2025 · Brentwoodstr. 37 · 22 kW · Energie Service GmbH der Stadtwerke Roth
- 20 Nov 2025 · Willy-Supf-Platz 1 · 22 kW · Energie Service GmbH der Stadtwerke Roth
- 31 Mar 2025 · Belmbracher Str. - · 22 kW · Energie Service GmbH der Stadtwerke Roth
- 26 Mar 2025 · Nürnberger Str. 41 · 300 kW · EnBW mobility+ AG und Co.KG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Wendelstein 62
- Hilpoltstein 57
- Greding 42
- Kammerstein 31
- Abenberg 29
- Röttenbach 27
Data: official national charge point register (1 September 2026). Data sources