Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Landkreis Nordwestmecklenburg · Mecklenburg-Vorpommern · Germany

EV charging stations in Grevesmühlen

11 public charging sites with 25 charge points are registered in Grevesmühlen, including 13 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is WVG-GVM with 10 charge points; 4 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites11
Charge points25
DC fast points13
150 kW and up12

Charge points by power

≤ 11 kW2
12–22 kW8
23–49 kW0
50–149 kW2
≥ 150 kW13

Operators

WVG-GVM10
E.ON Drive Infrastructure8
EnBW mobility+ AG und Co.KG5
enosys Recycling GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Gebhartstr. 4, 23936 Grevesmühlen
    E.ON Drive Infrastructure400 kW8 pointsCCS24/7
    Directions
  • Klützer Straße 1, 23936 Grevesmühlen
    EnBW mobility+ AG und Co.KG150 kW5 pointsCCS, Type 2
    Directions
  • Grüner Weg 27, 23936 Grevesmühlen
    WVG-GVM50 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Bahnhof 1, 23936 Grevesmühlen
    WVG-GVM22 kW4 pointsType 2
    Directions
  • Am Baarssee 3, 23936 Grevesmühlen
    enosys Recycling GmbH22 kW2 pointsType 2
    Directions
  • August-Bebel-Straße 4, 23936 Grevesmühlen
    WVG-GVM22 kW2 pointsType 2
    Directions
  • Klützer Straße 27, 23936 Grevesmühlen
    WVG-GVM11 kW2 pointsType 2
    Directions

Recently opened

  • 23 Dec 2025 · Gebhartstr. 4 · 400 kW · E.ON Drive Infrastructure
  • 2 Jan 2024 · Klützer Straße 27 · 11 kW · WVG-GVM
  • 18 Dec 2023 · Klützer Straße 1 · 150 kW · EnBW mobility+ AG und Co.KG
  • 29 Dec 2022 · Am Baarssee 3 · 22 kW · enosys Recycling GmbH
  • 21 Apr 2021 · August-Bebel-Straße 4 · 22 kW · WVG-GVM

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out