Day-ahead today18:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Kreis Minden-Lübbecke · Nordrhein-Westfalen · Germany

EV charging stations in Hille

12 public charging sites with 25 charge points are registered in Hille, including 10 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 180 kW.

The largest operator is Vattenfall Smarter Living GmbH with 4 charge points; 10 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites12
Charge points25
DC fast points10
150 kW and up10

Charge points by power

≤ 11 kW4
12–22 kW10
23–49 kW0
50–149 kW0
≥ 150 kW11

Operators

Vattenfall Smarter Living GmbH4
TZE28 Solar GbR4
EDEKA-MIHA Charge GmbH3
GreenCharge GmbH2
HiRo Service GmbH2
Westfalen Weser Ladeservice GmbH2
Volksbank in Ostwestfalen eG2
lgzhille GmbH2
Martin Stickdorn Immobilien2
Olaf Labitzke2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Mindener Str. 447, 32479 Hille
    Vattenfall Smarter Living GmbH180 kW4 pointsCCS24/7
    Directions
  • Mindener Str. 71, 32479 Hille
    EDEKA-MIHA Charge GmbH150 kW3 pointsCCS, Type 224/7
    Directions
  • Lübbecker Str. 91, 32479 Hille
    GreenCharge GmbH150 kW2 pointsCCS24/7
    Directions
  • Lübbecker Str. 91, 32479 Hille
    HiRo Service GmbH150 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Erdbrügge 28, 32479 Hille
    TZE28 Solar GbR22 kW4 pointsType 2
    Directions
  • Am Rathaus 4, 32479 Hille
    Westfalen Weser Ladeservice GmbH22 kW2 pointsType 2
    Directions
  • Dorfstr. 10, 32479 Hille
    Volksbank in Ostwestfalen eG22 kW2 pointsType 224/7
    Directions
  • Erdbrügge 22, 32479 Hille
    lgzhille GmbH22 kW2 pointsType 2
    Directions
  • Brennhorster Str. 12, 32479 Hille
    Martin Stickdorn Immobilien11 kW2 pointsType 224/7
    Directions
  • Brennhorster Straße 6, 32479 Hille
    Olaf Labitzke11 kW2 pointsType 2
    Directions

Recently opened

  • 2 Feb 2026 · Mindener Str. 447 · 180 kW · Vattenfall Smarter Living GmbH
  • 19 Aug 2025 · Mindener Str. 71 · 150 kW · EDEKA-MIHA Charge GmbH
  • 17 Jun 2025 · Brennhorster Str. 12 · 11 kW · Martin Stickdorn Immobilien
  • 2 Dec 2024 · Dorfstr. 10 · 22 kW · Volksbank in Ostwestfalen eG
  • 30 Sept 2024 · Brennhorster Straße 6 · 11 kW · Olaf Labitzke

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out