EV charging stations in Lübbecke
34 public charging sites with 68 charge points are registered in Lübbecke, including 22 DC fast-charging points and 18 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Stadtwerke Lübbecke GmbH with 26 charge points; 16 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Zeiss-Str. 1, 32312 LübbeckeDirections
- Ravensberger Str. 11, 32312 LübbeckeDirections
- Strubbergstr. 4, 32312 LübbeckeDirections
- Thyssenstr. 11, 32312 LübbeckeDirections
- Augustaweg 9, 32312 LübbeckeDirections
- Siemensstr. 4, 32312 LübbeckeDirections
- Hauptstr. 113, 32312 LübbeckeDirections
Other charging sites
AC charge points, sorted by number of points.
- Papendiek 11, 32312 LübbeckeDirections
- Daimlerstr. 34-36, 32312 LübbeckeDirections
- Am Friedhof 5, 32312 LübbeckeDirections
- Husener Str. 16, 32312 LübbeckeDirections
- Paul-Gauselmann-Straße 1, 32312 LübbeckeDirections
- Gasstr. 1, 32312 LübbeckeDirections
- Am Dornbusch 2, 32312 LübbeckeDirections
- Am Kirchhof 10, 32312 LübbeckeDirections
- Mindener Str. 19, 32312 LübbeckeDirections
- Geistwall 32, 32312 LübbeckeDirections
- Rahdener Straße 115, 32312 LübbeckeDirections
- Rahdener Str. 139, 32312 LübbeckeDirections
- Weingartenstr. 999, 32312 LübbeckeDirections
- Am Zollamt 4, 32312 LübbeckeDirections
- Daimlerstr. 26, 32312 LübbeckeDirections
- Hahler Strasse 18, 32312 LübbeckeDirections
- Schillerstr 34, 32312 LübbeckeDirections
Recently opened
- 12 May 2025 · Ravensberger Str. 11 · 180 kW · Vattenfall Smarter Living GmbH
- 8 Jan 2025 · Zeiss-Str. 1 · 400 kW · EWE Go HOCHTIEF Ladepartner GmbH & Co. KG
- 23 Oct 2024 · Hauptstr. 113 · 40 kW · Fritz Schmale GmbH
- 29 Apr 2024 · Strubbergstr. 4 · 150 kW · EnBW mobility+ AG und Co.KG
- 25 Mar 2024 · Rahdener Str. 139 · 22 kW · Autohaus Sieg GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Bad Oeynhausen 116
- Minden 107
- Porta Westfalica 82
- Stemwede 31
- Espelkamp 26
- Hille 25
Data: official national charge point register (1 September 2026). Data sources