EV charging stations in Hof
46 public charging sites with 89 charge points are registered in Hof, including 28 DC fast-charging points and 20 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Motor-Nützel with 24 charge points; 17 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Wunsiedler Str. 3, 95032 HofDirections
- Wunsiedler Str. 11, 95032 HofDirections
- Wunsiedler Str. 72, 95032 HofDirections
- Ossecker Str. 179, 95030 HofDirections
- An der Michaelisbrücke 2, 95028 HofDirections
- Ludwigstr. 9-11, 95028 HofDirections
- Hans-Böckler-Str. 19, 95032 HofDirections
- Schaumbergstr. 15, 95032 HofDirections
- Carl-Benz-Str. 4, 95032 HofDirections
Other charging sites
AC charge points, sorted by number of points.
- Fuhrmannstr. 25, 95030 HofDirections
- Kulmbacher Str. 5, 95030 HofDirections
- Wunsiedler Straße 2, 95032 HofDirections
- Oberer Anger 0, 95028 HofDirections
- Kreuzsteinstraße 0, 95028 HofDirections
- Klosterstraße 3, 95028 HofDirections
- Klosterstr. 3, 95028 HofDirections
- Ferdinand-Porsche-Straße 10, 95028 HofDirections
- Breslaustraße 30, 95028 HofDirections
- Nailaer Straße 2a, 95030 HofDirections
- Schneebergstr. 5, 95032 HofDirections
- Schaumbergstraße 14, 95032 HofDirections
- Wilhelm-Kohlhoff-Straße 22Directions
- Hans-Böckler-Straße 30, 95032 HofDirections
- Eppenreuther Str. 50a, 95032 HofDirections
- Rupprechtstraße 28, 95030 HofDirections
- Erich-Kästner-Straße 2, 95032 HofDirections
- Kornbergstraße 14, 95032 HofDirections
Recently opened
- 18 Jun 2026 · Breslaustraße 30 · 22 kW · Wirelane GmbH
- 18 Jun 2026 · Wilhelm-Kohlhoff-Straße 22 · 22 kW · Wirelane GmbH
- 21 Apr 2026 · Eppenreuther Str. 50a · 22 kW · Sparkasse Hochfranken
- 14 Apr 2026 · Wunsiedler Str. 11 · 300 kW · POTR
- 19 Dec 2025 · Wunsiedler Str. 3 · 400 kW · Eviny
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Naila 33
- Münchberg 83
- Selb 39
- Plauen 80
- Schleiz 140
- Wunsiedel 38
- Himmelkron 74
- Marktredwitz 35
- Kulmbach 76
- Kronach 50
- Neudrossenfeld 26
- Bindlach 33
Data: official national charge point register (1 September 2026). Data sources