EV charging stations in Marktredwitz
17 public charging sites with 35 charge points are registered in Marktredwitz, including 10 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 200 kW.
The largest operator is Kommunalunternehmen Marktredwitz AöR with 8 charge points; 14 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Fritz-Thomas-Str 1, 95615 MarktredwitzDirections
- Böttgerstr. 9, 95615 MarktredwitzDirections
- Wölsauer Str. 20a, 95615 MarktredwitzDirections
- Bayreuther Str. 15, 95615 MarktredwitzDirections
- Wölsauer Str. 38, 95615 MarktredwitzDirections
- Waldershofer Str. 14, 95615 MarktredwitzDirections
Other charging sites
AC charge points, sorted by number of points.
- Fabrikstraße 8, 95615 MarktredwitzDirections
- Fabrikstr. 8, 95615 MarktredwitzDirections
- La-Mure-Platz 0, 95615 MarktredwitzDirections
- Industrieallee 6, 95615 MarktredwitzDirections
- Industrieallee 6, 95615 MarktredwitzDirections
- Kösseinestraße 20, 95615 MarktredwitzDirections
- Breslauer Straße 22, 95615 MarktredwitzDirections
- Kösseinestraße 2, 95615 MarktredwitzDirections
- Pfaffenreuth 11, 95615 MarktredwitzDirections
- Zaunkönigstraße 12, 95615 MarktredwitzDirections
- Pfaffenreuth 61, 95615 MarktredwitzDirections
Recently opened
- 1 Jun 2024 · Fabrikstr. 8 · 22 kW · Kommunalunternehmen Marktredwitz AöR
- 6 May 2024 · Fabrikstraße 8 · 22 kW · Kommunalunternehmen Marktredwitz AöR
- 16 Apr 2024 · Wölsauer Str. 20a · 150 kW · Allego
- 24 Feb 2024 · Kösseinestraße 2 · 11 kW · nachbar holding GmbH
- 15 Jan 2024 · Breslauer Straße 22 · 22 kW · ZukunftsEnergie Nordostbayern
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Selb 39
- Wunsiedel 38
- Mitterteich 46
- Windischeschenbach 40
- Tirschenreuth 36
- Münchberg 83
- Bindlach 33
- Himmelkron 74
- Bayreuth 262
- Hof 89
- Weiden 41
- Weiden i.d.OPf. 53
Data: official national charge point register (1 September 2026). Data sources