EV charging stations in Jülich
45 public charging sites with 81 charge points are registered in Jülich, including 29 DC fast-charging points and 22 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is The Future Drive GmbH with 20 charge points; 16 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Rurauenstr. 0, 52428 JülichDirections
- Am Brainergy Park 4, 52428 JülichDirections
- Neusser Str. 45, 52428 JülichDirections
- Autobahn 0, 52428 JülichDirections
- Kölnstr. 22, 52428 JülichDirections
- Autobahnraststätte West 0, 52428 JülichDirections
- Berliner Straße 1, 52428 JülichDirections
- An der Leimkaul 1, 52428 JülichDirections
- Autobahnraststätte Ruraue Ost 0, 52428 JülichDirections
- An d. Vogelstange 93B, 52428 JülichDirections
Other charging sites
AC charge points, sorted by number of points.
- Düsseldorfer Str. 26, 52428 JülichDirections
- Stetternicher Staatsforst 0, 52428 JülichDirections
- Heinrich-Mußmann-Str. 1, 52428 JülichDirections
- Kartäuserstr. 0, 52428 JülichDirections
- Heinrich-Mußmann-Straße 1, 52428 JülichDirections
- Rudolf-Diesel-Straße 2, 52428 JülichDirections
- Karl-Heinz-Beckhurts-Str. 13, 52428 JülichDirections
- Schirmerstraße 1-A, 52428 JülichDirections
- Am Waldeck 2, 52428 JülichDirections
- Kurfürstenstraße 22, 52428 JülichDirections
- Prümer Weg 18, 52428 JülichDirections
- Max-Planck-Str. 3A, 52428 JülichDirections
Recently opened
- 23 Apr 2026 · Kölnstr. 22 · 200 kW · SWJ EE-Verwaltung GmbH
- 27 Jan 2026 · Am Brainergy Park 4 · 400 kW · NEW
- 11 Oct 2025 · Max-Planck-Str. 3A · 11 kW · cocharge
- 27 Jun 2025 · Heinrich-Mußmann-Str. 1 · 22 kW · The Future Drive GmbH
- 3 Jun 2025 · Rurauenstr. 0 · 400 kW · EWE Go HOCHTIEF Ladepartner GmbH & Co. KG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Düren 404
- Niederzier 50
- Nörvenich 45
- Baesweiler 50
- Eschweiler 167
- Alsdorf 45
- Bedburg 50
- Übach-Palenberg 48
- Erkelenz 99
- Geilenkirchen 68
- Hückelhoven 100
- Würselen 128
Data: official national charge point register (1 September 2026). Data sources