EV charging stations in Kamp-Lintfort
46 public charging sites with 84 charge points are registered in Kamp-Lintfort, including 44 DC fast-charging points and 38 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is EWE Go HOCHTIEF Ladepartner GmbH & Co. KG with 12 charge points; 16 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Friedrichstr. 0, 47475 Kamp-LintfortDirections
- Friedrich-Heinrich-Allee 182, 47475 Kamp-LintfortDirections
- Kruppstraße 4, 47475 Kamp-LintfortDirections
- Prinzenstr. 11, 47475 Kamp-LintfortDirections
- Oststr. 30, 47475 Kamp-LintfortDirections
- Prinzenstr. 84, 47475 Kamp-LintfortDirections
- Saalhoffer Str. 327, 47475 Kamp-LintfortDirections
- Prinzenstr. 80-84, 47475 Kamp-LintfortDirections
- Bürgermeister-Schmelzing-Str. 96, 47475 Kamp-LintfortDirections
Other charging sites
AC charge points, sorted by number of points.
- Oststr. 80, 47475 Kamp-LintfortDirections
- Neuendickstr. 96, 47475 Kamp-LintfortDirections
- Hoerstgener Str. 132, 47475 Kamp-LintfortDirections
- Bürgermeister-Schmelzing-Str. 90B, 47475 Kamp-LintfortDirections
- Wilhelmstr. 1 A, 47475 Kamp-LintfortDirections
- Carl-Friedrich-Gauß-Str. 2, 47475 Kamp-LintfortDirections
- Kamperdickstr. 20, 47475 Kamp-LintfortDirections
- Jahnstraße 33, 47475 Kamp-LintfortDirections
- Bürgermeister-Schmelzing-Straße 82, 47475 Kamp-LintfortDirections
- Oststraße 5-5a, 47475 Kamp-LintfortDirections
- Bürgermeister-Schmelzing-Str. 90A, 47475 Kamp-LintfortDirections
- Oststraße 80, 47475 Kamp-LintfortDirections
- Klotenstraße 271A, 47475 Kamp-LintfortDirections
Recently opened
- 15 Dec 2025 · Friedrichstr. 0 · 400 kW · EWE Go HOCHTIEF Ladepartner GmbH & Co. KG
- 1 Dec 2025 · Prinzenstr. 80-84 · 60 kW · Lidl
- 28 Nov 2025 · Jahnstraße 33 · 22 kW · Wirelane GmbH
- 28 Nov 2025 · Bürgermeister-Schmelzing-Straße 82 · 22 kW · Wirelane GmbH
- 13 Nov 2025 · Bürgermeister-Schmelzing-Str. 96 · 50 kW · Reload-Solution GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Moers 448
- Wesel 134
- Dinslaken 123
- Hamminkeln 68
- Xanten 61
- Rheinberg 56
- Neukirchen-Vluyn 50
- Schermbeck 32
- Voerde (Niederrhein) 31
- Hünxe 25
Data: official national charge point register (1 September 2026). Data sources