Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Wesel · Nordrhein-Westfalen · Germany

EV charging stations in Schermbeck

16 public charging sites with 32 charge points are registered in Schermbeck, including 3 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Landhotel Voshövel with 20 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites16
Charge points32
DC fast points3
150 kW and up2

Charge points by power

≤ 11 kW0
12–22 kW30
23–49 kW0
50–149 kW0
≥ 150 kW2

Operators

Landhotel Voshövel20
Rhegio Natur GmbH4
Westenergie Metering GmbH4
Shell Deutschland GmbH2
Fasselt GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Freudenbergstr. 383, 46514 Schermbeck
    Shell Deutschland GmbH300 kW2 pointsCCS24/7
    Directions
  • Kapellenweg 42, 46514 Schermbeck
    Fasselt GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Voshövel 1, 46514 Schermbeck
    Landhotel Voshövel22 kW20 pointsType 224/7
    Directions
  • Am Voshövel 1, 46514 Schermbeck
    Rhegio Natur GmbH22 kW4 pointsType 2
    Directions
  • Weseler Straße 2, 46514 Schermbeck
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Hinter der Mauer 900, 46514 Schermbeck
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 19 Jun 2026 · Freudenbergstr. 383 · 300 kW · Shell Deutschland GmbH
  • 21 Apr 2026 · Am Voshövel 1 · 22 kW · Landhotel Voshövel
  • 19 Jan 2021 · Kapellenweg 42 · 22 kW · Fasselt GmbH
  • 31 Oct 2019 · Am Voshövel 1 · 22 kW · Rhegio Natur GmbH
  • 18 Mar 2019 · Hinter der Mauer 900 · 22 kW · Westenergie Metering GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET