Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Schwäbisch Hall · Baden-Württemberg · Germany

EV charging stations in Kirchberg an der Jagst

30 public charging sites with 41 charge points are registered in Kirchberg an der Jagst, including 14 DC fast-charging points and 14 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is ingenia projects GmbH & Co. KG with 22 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites30
Charge points41
DC fast points14
150 kW and up14

Charge points by power

≤ 11 kW21
12–22 kW5
23–49 kW0
50–149 kW0
≥ 150 kW15

Operators

ingenia projects GmbH & Co. KG22
Milence8
MER Germany5
Landhotel Kirchberg GmbH3
EnBW ODR AG2
oliver kratzsch1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Von-Humboldt-Str. 5/2, 74592 Kirchberg an der Jagst
    Milence400 kW8 pointsCCS24/7
    Directions
  • Im Seefeld 2, 74592 Kirchberg an der Jagst
    MER Germany300 kW5 pointsCCS, CHAdeMO, Type 224/7
    Directions
  • Rudolf-Diesel-Str. 3, 74592 Kirchberg an der Jagst
    ingenia projects GmbH & Co. KG150 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Rudolf-Diesel-Str. 5, 74592 Kirchberg an der Jagst
    ingenia projects GmbH & Co. KG11 kW20 pointsType 224/7
    Directions
  • Eichenweg 2, 74592 Kirchberg an der Jagst
    Landhotel Kirchberg GmbH22 kW3 pointsType 224/7
    Directions
  • Crailsheimer Straße 1, 74592 Kirchberg an der Jagst
    EnBW ODR AG22 kW2 pointsType 2
    Directions
  • Sonnenrain 18, 74592 Kirchberg an der Jagst
    oliver kratzsch11 kW1 pointsType 2
    Directions

Recently opened

  • 2 Jul 2025 · Von-Humboldt-Str. 5/2 · 400 kW · Milence
  • 6 Feb 2025 · Rudolf-Diesel-Str. 5 · 11 kW · ingenia projects GmbH & Co. KG
  • 27 Sept 2024 · Im Seefeld 2 · 300 kW · MER Germany
  • 12 Apr 2024 · Rudolf-Diesel-Str. 3 · 150 kW · ingenia projects GmbH & Co. KG
  • 1 Jan 2024 · Sonnenrain 18 · 11 kW · oliver kratzsch

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET