Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Hohenlohekreis · Baden-Württemberg · Germany

EV charging stations in Neuenstein

21 public charging sites with 29 charge points are registered in Neuenstein, including 20 DC fast-charging points and 18 delivering at least 150 kW. The most powerful points deliver up to 350 kW.

The largest operator is IONITY GmbH with 12 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites21
Charge points29
DC fast points20
150 kW and up18

Charge points by power

≤ 11 kW1
12–22 kW8
23–49 kW0
50–149 kW0
≥ 150 kW20

Operators

IONITY GmbH12
IMS Verbindungstechnik GmbH & Co.KG8
Pfalzwerke AG4
EnBW mobility+ AG und Co.KG4
cocharge1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Hohenlohe Nord 0, 74632 Neuenstein
    IONITY GmbH350 kW4 pointsCCS
    Directions
  • Hohenlohe Süd 0, 74632 Neuenstein
    IONITY GmbH350 kW4 pointsCCS
    Directions
  • BAB Raststätte Hohenlohe Nord 0, 74632 Neuenstein
    IONITY GmbH350 kW2 pointsCCS24/7
    Directions
  • BAB Raststätte Hohenlohe Süd 0, 74632 Neuenstein
    IONITY GmbH350 kW2 pointsCCS24/7
    Directions
  • Kirchensaller Str. 59, 74632 Neuenstein
    Pfalzwerke AG300 kW2 pointsCCS24/7
    Directions
  • Lohemer Feld 0, 74632 Neuenstein
    EnBW mobility+ AG und Co.KG150 kW4 pointsCCS
    Directions
  • Kirchensaller Straße 59, 74632 Neuenstein
    Pfalzwerke AG150 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Robert-Bosch-Straße 5, 74632 Neuenstein
    IMS Verbindungstechnik GmbH & Co.KG22 kW8 pointsType 2
    Directions
  • Turmweg 3, 74632 Neuenstein
    cocharge11 kW1 pointsType 224/7
    Directions

Recently opened

  • 15 Dec 2025 · Kirchensaller Str. 59 · 300 kW · Pfalzwerke AG
  • 9 Dec 2025 · Turmweg 3 · 11 kW · cocharge
  • 15 Apr 2025 · BAB Raststätte Hohenlohe Süd 0 · 350 kW · IONITY GmbH
  • 31 Mar 2025 · BAB Raststätte Hohenlohe Nord 0 · 350 kW · IONITY GmbH
  • 28 Jun 2023 · Kirchensaller Straße 59 · 150 kW · Pfalzwerke AG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET