EV charging stations in Kleinmachnow
26 public charging sites with 62 charge points are registered in Kleinmachnow, including 11 DC fast-charging points and 11 delivering at least 150 kW. The most powerful points deliver up to 350 kW.
The largest operator is EMB Energie Brandenburg GmbH with 35 charge points; 9 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Albert-Einstein-Ring 49, 14532 KleinmachnowDirections
- Stolper Weg 55, 14532 KleinmachnowDirections
- Heidefeld 60, 14532 KleinmachnowDirections
- Adolf-Grimme-Ring 8, 14532 KleinmachnowDirections
Other charging sites
AC charge points, sorted by number of points.
- Albert-Einstein-Ring 8, 14532 KleinmachnowDirections
- Heinrich-Hertz-Strasse 6, 14532 KleinmachnowDirections
- Erlenweg 72, 14532 KleinmachnowDirections
- August-Bebel-Platz 1, 14532 KleinmachnowDirections
- Fahrenheitstraße 1, 14532 KleinmachnowDirections
- An der Stammbahn 2, 14532 KleinmachnowDirections
- Adolf-Grimme-Ring 10, 14532 KleinmachnowDirections
- Gerhard-Eisler-Straße 10, 14532 KleinmachnowDirections
- Adolf-Grimme-Ring 14, 14532 KleinmachnowDirections
- Förster-Funke-Allee 103, 14532 KleinmachnowDirections
- Zehlendorfer Damm 108, 14532 KleinmachnowDirections
- Zehlendorfer Damm 211, 14532 KleinmachnowDirections
- Meiereifeld 7E, 14532 KleinmachnowDirections
Recently opened
- 11 Feb 2026 · Erlenweg 72 · 22 kW · Augustinum Energiemanagement GmbH
- 19 May 2025 · Heidefeld 60 · 180 kW · Vattenfall Smarter Living GmbH
- 1 Jan 2024 · Albert-Einstein-Ring 49 · 350 kW · Porsche Niederlassung Berlin Potsdam GmbH
- 9 Oct 2023 · Heinrich-Hertz-Strasse 6 · 11 kW · CUBOS Service GmbH
- 16 May 2023 · Stolper Weg 55 · 300 kW · EWE Go GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Teltow 49
- Werder (Havel) 45
- Beelitz 35
- Michendorf 33
Data: official national charge point register (1 September 2026). Data sources