Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Potsdam-Mittelmark · Brandenburg · Germany

EV charging stations in Michendorf

16 public charging sites with 33 charge points are registered in Michendorf, including 8 DC fast-charging points and 7 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is EMB Energie Brandenburg GmbH with 14 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites16
Charge points33
DC fast points8
150 kW and up7

Charge points by power

≤ 11 kW0
12–22 kW14
23–49 kW0
50–149 kW0
≥ 150 kW19

Operators

EMB Energie Brandenburg GmbH14
EA-DD8
Shell Deutschland GmbH4
Energie und Wasser Potsdam GmbH2
Autohaus Kühnicke2
Citywatt GmbH2
E.ON Drive Infrastructure1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • An der Autobahn 1a, 14552 Michendorf
    Shell Deutschland GmbH300 kW4 pointsCCS24/7
    Directions
  • Michendorf Nord BAB 10 BAB 10
    E.ON Drive Infrastructure160 kW1 pointsCCS, CHAdeMO
    Directions
  • Büdnergasse 1, 14552 Michendorf
    EMB Energie Brandenburg GmbH150 kW14 pointsCCS, Type 224/7
    Directions
  • Potsdamer Str. 97, 14552 Michendorf
    Autohaus Kühnicke22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Bahnhof 1, 14552 Michendorf
    EA-DD22 kW2 pointsType 224/7
    Directions
  • Richard-Muth-Platz 1, 14552 Michendorf
    Energie und Wasser Potsdam GmbH22 kW2 pointsType 224/7
    Directions
  • Potsdamer Str. 4, 14552 Michendorf
    EA-DD22 kW2 pointsType 224/7
    Directions
  • Dr.-Albert-Schweitzer-Str. 4, 14552 Michendorf
    EA-DD22 kW2 pointsType 224/7
    Directions
  • Potsdamer Str. 64, 14552 Michendorf
    EA-DD22 kW2 pointsType 224/7
    Directions
  • Luckenwalder Straße 118, 14552 Michendorf
    Citywatt GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 24 Jul 2026 · An der Autobahn 1a · 300 kW · Shell Deutschland GmbH
  • 2 Apr 2026 · Richard-Muth-Platz 1 · 22 kW · Energie und Wasser Potsdam GmbH
  • 5 Dec 2023 · Potsdamer Str. 4 · 22 kW · EA-DD
  • 11 Oct 2023 · Büdnergasse 1 · 150 kW · EMB Energie Brandenburg GmbH
  • 6 Jul 2023 · Potsdamer Str. 64 · 22 kW · EA-DD

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET