EV charging stations in Lennestadt
29 public charging sites with 48 charge points are registered in Lennestadt, including 13 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is BIGGE ENERGIE GmbH & Co. KG with 25 charge points; 10 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Kölner Str. 112, 57368 LennestadtDirections
- Elsper Str. 42, 57368 LennestadtDirections
- Bielefelder Str. 123, 57368 LennestadtDirections
- Bielefelder Str. 61, 57368 LennestadtDirections
- Hagener Str. 68, 57368 LennestadtDirections
Other charging sites
AC charge points, sorted by number of points.
- Gartenstraße 8, 57368 LennestadtDirections
- Thomas Morus Platz 0, 57368 LennestadtDirections
- Gartenstr. 4, 57368 LennestadtDirections
- Wigeystr. 16, 57368 LennestadtDirections
- Schneidershof 1 Z, 57368 LennestadtDirections
- Von-Stephan-Str. 1 Z, 57368 LennestadtDirections
- Fasanenweg 1 Z, 57368 LennestadtDirections
- Hundemstraße 18z, 57368 LennestadtDirections
- Ladestraße 1Z, 57368 LennestadtDirections
- Amtshausplatz 1Z, 57368 LennestadtDirections
- Bielefelder Str. 36a, 57368 LennestadtDirections
- Am Biertappen 38 Z, 57368 LennestadtDirections
- Gustav-Hensel Str. 5 Z, 57368 LennestadtDirections
- Kölner Str. 72 Z, 57368 LennestadtDirections
- Hasenpfad 6a, 57368 LennestadtDirections
- Eichenstraße 13, 57368 LennestadtDirections
Recently opened
- 24 Feb 2026 · Bielefelder Str. 61 · 100 kW · EnBW mobility+ AG und Co.KG
- 21 Jan 2026 · Bielefelder Str. 123 · 300 kW · AVIA Volt
- 25 Aug 2025 · Kölner Str. 112 · 400 kW · Aral Pulse
- 23 May 2025 · Elsper Str. 42 · 400 kW · EWE Go GmbH
- 22 Apr 2024 · Gartenstraße 8 · 22 kW · Stadt Lennestadt
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Olpe 53
- Wenden 31
- Attendorn 28
- Hilchenbach 36
- Schmallenberg 73
- Kreuztal 59
- Sundern (Sauerland) 55
- Bad Berleburg 27
- Netphen 38
- Freudenberg 26
- Meinerzhagen 46
- Siegen 159
Data: official national charge point register (1 September 2026). Data sources