EV charging stations in Sundern (Sauerland)
28 public charging sites with 55 charge points are registered in Sundern (Sauerland), including 17 DC fast-charging points and 14 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Westenergie Metering GmbH with 14 charge points; 11 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Mescheder Str. 6, 59846 Sundern (Sauerland)Directions
- Hauptstr. 162, 59846 Sundern (Sauerland)Directions
- Esperantostr. 5, 59846 Sundern (Sauerland)Directions
- Hauptstraße 177, 59846 Sundern (Sauerland)Directions
- In der Ecke 6, 59846 Sundern (Sauerland)Directions
- Hauptstraße 210-214, 59846 Sundern (Sauerland)Directions
Other charging sites
AC charge points, sorted by number of points.
- Zum Dümpel 60, 59846 Sundern (Sauerland)Directions
- Rathauspl 2, 59846 Sundern (Sauerland)Directions
- Amecker Damm 1, 59846 Sundern (Sauerland)Directions
- Rathauspl. 2, 59846 Sundern (Sauerland)Directions
- Zum Hafen 2, 59846 Sundern (Sauerland)Directions
- Zum Sorpedamm 3, 59846 Sundern (Sauerland)Directions
- Ewiger Weg 6, 59846 Sundern (Sauerland)Directions
- Hagener Str. 32, 59846 Sundern (Sauerland)Directions
- Berliner Straße 62, 59846 Sundern (Sauerland)Directions
- Im Spring 11, 59846 Sundern (Sauerland)Directions
- Kirchkette 12, 59846 Sundern (Sauerland)Directions
Recently opened
- 27 May 2026 · Hauptstr. 162 · 300 kW · Shell Deutschland GmbH
- 18 Dec 2025 · Esperantostr. 5 · 200 kW · Tank & Wasch Udo Rosch
- 3 Dec 2025 · Mescheder Str. 6 · 400 kW · EWE Go HOCHTIEF Ladepartner GmbH & Co. KG
- 2 Sept 2025 · Hauptstraße 177 · 150 kW · EnBW mobility+ AG und Co.KG
- 12 Mar 2024 · In der Ecke 6 · 50 kW · Hymes Energy GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Arnsberg 103
- Schmallenberg 73
- Brilon 64
- Winterberg 54
- Marsberg 53
- Meschede 42
- Medebach 32
Data: official national charge point register (1 September 2026). Data sources