Day-ahead today06:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Mecklenburgische Seenplatte · Mecklenburg-Vorpommern · Germany

EV charging stations in Malchin

21 public charging sites with 30 charge points are registered in Malchin, including 6 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 360 kW.

The largest operator is Gut Pohnstorf GmbH with 12 charge points; 3 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites21
Charge points30
DC fast points6
150 kW and up6

Charge points by power

≤ 11 kW12
12–22 kW12
23–49 kW0
50–149 kW0
≥ 150 kW6

Operators

Gut Pohnstorf GmbH12
GP JOULE Connect GmbH12
Vattenfall Smarter Living GmbH6

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Teichstr. 8, 17139 Malchin
    Vattenfall Smarter Living GmbH360 kW6 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Bürgermeister-Tretow-Str. 13, 17139 Malchin
    Gut Pohnstorf GmbH22 kW6 pointsType 224/7
    Directions
  • Bürgermeister-Tretow-Str. 13, 17139 Malchin
    GP JOULE Connect GmbH22 kW6 pointsType 2
    Directions
  • Achterstr. 00, 17139 Malchin
    Gut Pohnstorf GmbH11 kW6 pointsType 224/7
    Directions
  • Achterstr. 0, 17139 Malchin
    GP JOULE Connect GmbH11 kW6 pointsType 2
    Directions

Recently opened

  • 12 Feb 2026 · Teichstr. 8 · 360 kW · Vattenfall Smarter Living GmbH
  • 10 Mar 2025 · Bürgermeister-Tretow-Str. 13 · 22 kW · GP JOULE Connect GmbH
  • 30 Dec 2024 · Bürgermeister-Tretow-Str. 13 · 22 kW · Gut Pohnstorf GmbH
  • 19 Jan 2023 · Achterstr. 00 · 11 kW · Gut Pohnstorf GmbH
  • 17 Jan 2023 · Achterstr. 0 · 11 kW · GP JOULE Connect GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET