EV charging stations in Meppen
44 public charging sites with 82 charge points are registered in Meppen, including 28 DC fast-charging points and 20 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is nvb smart GmbH with 14 charge points; 14 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Lathener Straße 5, 49716 MeppenDirections
- Industriestr. 2-4, 49716 MeppenDirections
- Fürstenbergstr. 15, 49716 MeppenDirections
- Am Neuen Markt 4, 49716 MeppenDirections
- Fürstenbergstraße 7, 49716 MeppenDirections
- Esterfelder Stiege 113, 49716 MeppenDirections
- Helter Damm 11, 49716 MeppenDirections
- Teglinger Hauptstr. 11z, 49716 MeppenDirections
- Schützenhof 21, 49716 MeppenDirections
Other charging sites
AC charge points, sorted by number of points.
- Essener Str. 14, 49716 MeppenDirections
- Ordniederung 1, 49716 MeppenDirections
- Haselünnerstr. 20, 49716 MeppenDirections
- Nödiker Str. 102, 49716 MeppenDirections
- Helter Damm 0, 49716 MeppenDirections
- Hüttenstr. 1, 49716 MeppenDirections
- Kleiststraße 7, 49716 MeppenDirections
- Herzog-Arenberg-Straße 7, 49716 MeppenDirections
- An der Koppelschleuse 19, 49716 MeppenDirections
- Nagelshof 60, 49716 MeppenDirections
- Nagelshof 69, 49716 MeppenDirections
- Am Neuen Markt 86, 49716 MeppenDirections
- Lathener Straße 15a, 49716 MeppenDirections
- Daimlerstraße 19 c, 49716 MeppenDirections
- Ludmillenstraße 10, 49716 MeppenDirections
- Schwefinger Straße 3-5, 49716 MeppenDirections
- Schwefinger Str. 3-5, 49716 MeppenDirections
- Daimlerstr. 19c, 49716 MeppenDirections
- Böttgerstraße 3, 49716 MeppenDirections
- Dachsweg 13, 49716 MeppenDirections
Recently opened
- 18 Aug 2026 · Hüttenstr. 1 · 22 kW · Westenergie Metering GmbH
- 18 Aug 2026 · Am Neuen Markt 86 · 22 kW · Westenergie Metering GmbH
- 9 Jul 2026 · Fürstenbergstr. 15 · 150 kW · ALDI Nord
- 30 Apr 2026 · Industriestr. 2-4 · 300 kW · E.ON Drive Infrastructure
- 1 Dec 2025 · Essener Str. 14 · 22 kW · KUIPERS technologies GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Papenburg 165
- Emsbüren 91
- Rhede (Ems) 83
- Lingen 78
- Lingen (Ems) 64
- Haren (Ems) 63
- Haselünne 46
- Werlte 44
- Lünne 30
- Salzbergen 28
- Heede 25
- Sögel 25
Data: official national charge point register (1 September 2026). Data sources