Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Alb-Donau-Kreis · Baden-Württemberg · Germany

EV charging stations in Merklingen

329 public charging sites with 346 charge points are registered in Merklingen, including 70 DC fast-charging points and 70 delivering at least 150 kW. The most powerful points deliver up to 350 kW.

The largest operator is Zweckverband Region Schwäbische Alb with 259 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites329
Charge points346
DC fast points70
150 kW and up70

Charge points by power

≤ 11 kW264
12–22 kW12
23–49 kW0
50–149 kW0
≥ 150 kW70

Operators

Zweckverband Region Schwäbische Alb259
Tesla Germany GmbH40
IONITY GmbH24
Albwerk Elektro- und Kommunikationstechnik GmbH10
Aral Pulse4
SCHARR Drive Ladestation4
EWE Go GmbH2
HUMMEL Systemhaus GmbH & Co. KG2
Fahrzeugtechnik Schulz1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Nellingerstr. 25, 89188 Merklingen
    IONITY GmbH350 kW24 pointsCCS
    Directions
  • Nellinger Straße 24, 89188 Merklingen
    Aral Pulse300 kW4 pointsCCS, CHAdeMO
    Directions
  • Industriestr. 2, 89188 Merklingen
    EWE Go GmbH300 kW2 pointsCCS24/7
    Directions
  • Nellinger Strasse 25, 89188 Merklingen
    Tesla Germany GmbH250 kW40 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Mühlweg 100, 89188 Merklingen
    Zweckverband Region Schwäbische Alb11 kW259 pointsType 2
    Directions
  • Industriestr. 1, 89188 Merklingen
    Albwerk Elektro- und Kommunikationstechnik GmbH22 kW10 pointsType 224/7
    Directions
  • Hauptstr. 12, 89188 Merklingen
    SCHARR Drive Ladestation11 kW4 pointsType 224/7
    Directions
  • Nellinger Str. 23-25, 89188 Merklingen
    HUMMEL Systemhaus GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Industriestr. 14, 89188 Merklingen
    Fahrzeugtechnik Schulz11 kW1 pointsType 2
    Directions

Recently opened

  • 18 Jun 2026 · Hauptstr. 12 · 11 kW · SCHARR Drive Ladestation
  • 11 Dec 2023 · Industriestr. 1 · 22 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
  • 23 Oct 2023 · Nellingerstr. 25 · 350 kW · IONITY GmbH
  • 1 Oct 2023 · Mühlweg 100 · 11 kW · Zweckverband Region Schwäbische Alb
  • 20 Apr 2023 · Nellinger Strasse 25 · 250 kW · Tesla Germany GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET