EV charging stations in Meschede
26 public charging sites with 42 charge points are registered in Meschede, including 12 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 200 kW.
The largest operator is amperio GmbH (DEAMP) with 8 charge points; 13 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Warsteiner Str. 41, 59872 MeschedeDirections
- Steinwiese 2, 59872 MeschedeDirections
- Enster Str. 4, 59872 MeschedeDirections
- Jahnstraße 48, 59872 MeschedeDirections
Other charging sites
AC charge points, sorted by number of points.
- Lagerstr. 1, 59872 MeschedeDirections
- Berghausen 14, 59872 MeschedeDirections
- Am Kreishaus 0, 59872 MeschedeDirections
- Am Kreishaus 5, 59872 MeschedeDirections
- Sophienweg 9, 59872 MeschedeDirections
- Auf'm Brinke 21, 59872 MeschedeDirections
- Le-Puy-Str. 17z, 59872 MeschedeDirections
- Steinstraße 26, 59872 MeschedeDirections
- Arnsberger Straße 0, 59872 MeschedeDirections
- Rosenstraße 14, 59872 MeschedeDirections
- Zum Siepen 37, 59872 MeschedeDirections
- Steinstr. 44, 59872 MeschedeDirections
- Hünenburgstraße 92, 59872 MeschedeDirections
- Auf der Wauert 6, 59872 MeschedeDirections
- Steinstr. 28, 59872 MeschedeDirections
- Auf der Heide 31, 59872 MeschedeDirections
Recently opened
- 4 Dec 2024 · Warsteiner Str. 41 · 200 kW · Westfalen Weser Ladeservice GmbH
- 8 Nov 2024 · Steinstr. 44 · 22 kW · Hennedamm-Hotel
- 8 Jul 2024 · Berghausen 14 · 22 kW · Alexander Bürkle GmbH & Co. KG
- 27 May 2024 · Steinstr. 28 · 11 kW · Einzelunternehmen
- 10 Apr 2024 · Steinwiese 2 · 150 kW · amperio GmbH (DEAMP)
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Arnsberg 103
- Schmallenberg 73
- Brilon 64
- Sundern (Sauerland) 55
- Winterberg 54
- Marsberg 53
- Medebach 32
Data: official national charge point register (1 September 2026). Data sources