Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Hochsauerlandkreis · Nordrhein-Westfalen · Germany

EV charging stations in Meschede

26 public charging sites with 42 charge points are registered in Meschede, including 12 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 200 kW.

The largest operator is amperio GmbH (DEAMP) with 8 charge points; 13 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites26
Charge points42
DC fast points12
150 kW and up10

Charge points by power

≤ 11 kW3
12–22 kW25
23–49 kW0
50–149 kW4
≥ 150 kW10

Operators

amperio GmbH (DEAMP)8
Hochsauerlandenergie GmbH8
Allego4
Alexander Bürkle GmbH & Co. KG4
Hochsauerlandkreis4
Westenergie Metering GmbH4
Westfalen Weser Ladeservice GmbH2
Heuel Schauerte GmbH & Co. KG2
ASS Solar Energie UG & Co. KG2
Hennedamm-Hotel1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Warsteiner Str. 41, 59872 Meschede
    Westfalen Weser Ladeservice GmbH200 kW2 pointsCCS24/7
    Directions
  • Steinwiese 2, 59872 Meschede
    amperio GmbH (DEAMP)150 kW8 pointsCCS
    Directions
  • Enster Str. 4, 59872 Meschede
    Allego50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Jahnstraße 48, 59872 Meschede
    Allego50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Lagerstr. 1, 59872 Meschede
    Hochsauerlandenergie GmbH22 kW4 pointsType 2
    Directions
  • Berghausen 14, 59872 Meschede
    Alexander Bürkle GmbH & Co. KG22 kW4 pointsType 224/7
    Directions
  • Am Kreishaus 0, 59872 Meschede
    Hochsauerlandkreis22 kW2 pointsType 2
    Directions
  • Am Kreishaus 5, 59872 Meschede
    Hochsauerlandkreis22 kW2 pointsType 2
    Directions
  • Sophienweg 9, 59872 Meschede
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Auf'm Brinke 21, 59872 Meschede
    Heuel Schauerte GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Le-Puy-Str. 17z, 59872 Meschede
    Westenergie Metering GmbH22 kW2 pointsType 224/7
    Directions
  • Steinstraße 26, 59872 Meschede
    ASS Solar Energie UG & Co. KG22 kW2 pointsType 2
    Directions
  • Arnsberger Straße 0, 59872 Meschede
    Hochsauerlandenergie GmbH22 kW1 pointsType 2
    Directions
  • Rosenstraße 14, 59872 Meschede
    Hochsauerlandenergie GmbH22 kW1 pointsType 2
    Directions
  • Zum Siepen 37, 59872 Meschede
    Hochsauerlandenergie GmbH22 kW1 pointsType 2
    Directions
  • Steinstr. 44, 59872 Meschede
    Hennedamm-Hotel22 kW1 pointsType 224/7
    Directions
  • Hünenburgstraße 92, 59872 Meschede
    Hochsauerlandenergie GmbH22 kW1 pointsType 2
    Directions
  • Auf der Wauert 6, 59872 Meschede
    Jürgen Spork11 kW1 pointsType 2
    Directions
  • Steinstr. 28, 59872 Meschede
    Einzelunternehmen11 kW1 pointsType 224/7
    Directions
  • Auf der Heide 31, 59872 Meschede
    Dennis Hengesbach11 kW1 pointsType 2
    Directions

Recently opened

  • 4 Dec 2024 · Warsteiner Str. 41 · 200 kW · Westfalen Weser Ladeservice GmbH
  • 8 Nov 2024 · Steinstr. 44 · 22 kW · Hennedamm-Hotel
  • 8 Jul 2024 · Berghausen 14 · 22 kW · Alexander Bürkle GmbH & Co. KG
  • 27 May 2024 · Steinstr. 28 · 11 kW · Einzelunternehmen
  • 10 Apr 2024 · Steinwiese 2 · 150 kW · amperio GmbH (DEAMP)

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET