EV charging stations in Mindelheim
47 public charging sites with 76 charge points are registered in Mindelheim, including 23 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Georg Jos. Kaes GmbH with 17 charge points; 13 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Allgäuer Str. 27, 87719 MindelheimDirections
- Reichenwallerstr. 4, 87719 MindelheimDirections
- Heimenegger Weg 3, 87719 MindelheimDirections
- Industriestr. 4, 87719 MindelheimDirections
- Nebelhornstraße 4, 87719 MindelheimDirections
- Nebelhornstraße 4, 87719 MindelheimDirections
- Hochvogelstr. 2a, 87719 MindelheimDirections
- Georgenstr. 0, 87719 MindelheimDirections
- Kloster-Heilig-Kreuz-Straße 2, 87719 MindelheimDirections
- Allgäuer Str. 21, 87719 MindelheimDirections
Other charging sites
AC charge points, sorted by number of points.
- Allgäuer Straße 19, 87719 MindelheimDirections
- Trettachstraße 4, 87719 MindelheimDirections
- Breitenbergstr. 2, 87719 MindelheimDirections
- Fellhornstr. 1, 87719 MindelheimDirections
- Hallstattstrasse 2, 87719 MindelheimDirections
- Reichenwaller Strasse 4, 87719 MindelheimDirections
- Im Eichet 7, 87719 MindelheimDirections
- Allgäuer Straße 11, 87719 MindelheimDirections
- Stillachstr. 2b, 87719 MindelheimDirections
- Maximilianstraße 39, 87719 MindelheimDirections
- Am Schaucherbach 1, 87719 MindelheimDirections
Recently opened
- 6 Jul 2026 · Georgenstr. 0 · 50 kW · VWEW Kommunal GmbH
- 6 May 2026 · Allgäuer Str. 27 · 400 kW · EWE Go GmbH
- 19 Dec 2025 · Breitenbergstr. 2 · 22 kW · BAUER
- 19 Dec 2025 · Stillachstr. 2b · 22 kW · BAUER
- 9 Apr 2025 · Am Schaucherbach 1 · 11 kW · Markus Stoll
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Bad Wörishofen 126
- Ungerhausen 72
- Memmingerberg 49
- Benningen 34
- Türkheim 31
- Ottobeuren 28
- Erkheim 25
- Woringen 25
Data: official national charge point register (1 September 2026). Data sources