Day-ahead today15:55€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Unterallgäu · Bayern · Germany

EV charging stations in Woringen

20 public charging sites with 25 charge points are registered in Woringen, including 23 DC fast-charging points and 18 delivering at least 150 kW. The most powerful points deliver up to 250 kW.

The largest operator is Tesla Germany GmbH with 16 charge points; 4 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites20
Charge points25
DC fast points23
150 kW and up18

Charge points by power

≤ 11 kW0
12–22 kW0
23–49 kW0
50–149 kW6
≥ 150 kW19

Operators

Tesla Germany GmbH16
allgäuload4
LEW Natur GmbH3
Patrick Wiese2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Bahnhofstraße 12, 87789 Woringen
    Tesla Germany GmbH250 kW16 pointsCCS
    Directions
  • Bahnhofstr. 1, 87789 Woringen
    LEW Natur GmbH150 kW3 pointsCCS, Type 224/7
    Directions
  • Oberes Ösch 600, 87789 Woringen
    Patrick Wiese75 kW2 pointsCCS24/7
    Directions
  • Kempterstraße 10, 87789 Woringen
    allgäuload50 kW2 pointsCCS, Type 2
    Directions
  • Bahnhofstr. 12a, 87789 Woringen
    allgäuload50 kW2 pointsCCS24/7
    Directions

Recently opened

  • 15 Apr 2026 · Bahnhofstr. 12a · 50 kW · allgäuload
  • 3 Sept 2025 · Oberes Ösch 600 · 75 kW · Patrick Wiese
  • 13 May 2024 · Bahnhofstr. 1 · 150 kW · LEW Natur GmbH
  • 27 Dec 2023 · Kempterstraße 10 · 50 kW · allgäuload
  • 20 Mar 2023 · Bahnhofstraße 12 · 250 kW · Tesla Germany GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out