EV charging stations in Mühlacker
36 public charging sites with 67 charge points are registered in Mühlacker, including 21 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 360 kW.
The largest operator is Stadtwerke Mühlacker GmbH with 46 charge points; 9 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Kanalstr. B10, 75417 MühlackerDirections
- Uhlandstr. 99, 75417 MühlackerDirections
- Enzstraße 29, 75417 MühlackerDirections
- Goethestr. 5, 75417 MühlackerDirections
- Goethestr. 15, 75417 MühlackerDirections
- St. Andreas-Straße 5, 75417 MühlackerDirections
- Bahnhofstraße 100, 75417 MühlackerDirections
- Industriestr. 112, 75417 MühlackerDirections
- Industriestraße 27, 75417 MühlackerDirections
Other charging sites
AC charge points, sorted by number of points.
- Rappstraße 38, 75417 MühlackerDirections
- Goethestraße 15, 75417 MühlackerDirections
- Kapellenweg 1, 75417 MühlackerDirections
- Berliner Ring 1, 75417 MühlackerDirections
- In den Waldäckern 2, 75417 MühlackerDirections
- Ascherstr. 2, 75417 MühlackerDirections
- Mühlackerstraße 3Directions
- Zaisersweiherstraße 3, 75417 MühlackerDirections
- Marktplatz 6, 75417 MühlackerDirections
- Kanalstr. 10, 75417 MühlackerDirections
- Roßwager Straße 36, 75417 MühlackerDirections
- Schillerstraße 38, 75417 MühlackerDirections
- Kanalstr. 46, 75417 MühlackerDirections
- Haldenstraße 89, 75417 MühlackerDirections
- Bahnhofstraße 8-10, 75417 MühlackerDirections
- Kelterplatz 7, 75417 MühlackerDirections
- Danziger Straße 17, 75417 MühlackerDirections
- Bahnhofstraße 119, 75417 MühlackerDirections
- Vetterstraße 27, 75417 MühlackerDirections
Recently opened
- 15 Dec 2025 · Marktplatz 6 · 22 kW · Stadtwerke Mühlacker GmbH
- 24 Aug 2025 · Goethestr. 15 · 150 kW · Stadtwerke Mühlacker GmbH
- 22 Apr 2025 · Ascherstr. 2 · 22 kW · Stadtwerke Mühlacker GmbH
- 22 Apr 2025 · Kanalstr. 10 · 22 kW · Stadtwerke Mühlacker GmbH
- 17 Dec 2024 · Uhlandstr. 99 · 350 kW · Stadtwerke Mühlacker GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Neuhausen 28
- Mönsheim 25
- Neuenbürg 25
- Ehningen 34
- Vaihingen an der Enz 27
- Pforzheim 349
- Bretten 91
- Rutesheim 29
- Markgröningen 26
- Renningen 122
- Schwieberdingen 215
- Ditzingen 49
Data: official national charge point register (1 September 2026). Data sources