Day-ahead today06:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Ludwigsburg · Baden-Württemberg · Germany

EV charging stations in Vaihingen an der Enz

14 public charging sites with 27 charge points are registered in Vaihingen an der Enz, including 0 DC fast-charging points. The most powerful points deliver up to 22 kW.

The largest operator is EnBW ODR AG with 12 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites14
Charge points27
DC fast points0
150 kW and up0

Charge points by power

≤ 11 kW1
12–22 kW26
23–49 kW0
50–149 kW0
≥ 150 kW0

Operators

EnBW ODR AG12
CUBOS Service GmbH10
Stadtwerke Mühlacker GmbH2
deer GmbH2
Aydin Karabeyaz1

Charging sites

AC charge points, sorted by number of points.

  • Horrheimer Str. 28-36, 71665 Vaihingen an der Enz
    CUBOS Service GmbH22 kW10 pointsType 224/7
    Directions
  • Fuchsäcker 0, 71665 Vaihingen an der Enz
    EnBW ODR AG22 kW4 pointsType 224/7
    Directions
  • Sogenring 1, 71665 Vaihingen an der Enz
    EnBW ODR AG22 kW2 pointsType 224/7
    Directions
  • Buolweg 17, 71665 Vaihingen an der Enz
    EnBW ODR AG22 kW2 pointsType 224/7
    Directions
  • Am Schloßgarten 23, 71665 Vaihingen an der Enz
    EnBW ODR AG22 kW2 pointsType 224/7
    Directions
  • Manfred-Behr-Str. 34, 71665 Vaihingen an der Enz
    Stadtwerke Mühlacker GmbH22 kW2 pointsType 224/7
    Directions
  • Bahnhofstr. 129, 71665 Vaihingen an der Enz
    EnBW ODR AG22 kW2 pointsType 224/7
    Directions
  • Stuttgarter Str. 46-52, 71665 Vaihingen an der Enz
    deer GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Brückenstraße 2, 71665 Vaihingen an der Enz
    Aydin Karabeyaz11 kW1 pointsdomestic socket, Type 2
    Directions

Recently opened

  • 9 Oct 2025 · Buolweg 17 · 22 kW · EnBW ODR AG
  • 30 Sept 2025 · Fuchsäcker 0 · 22 kW · EnBW ODR AG
  • 8 Sept 2025 · Am Schloßgarten 23 · 22 kW · EnBW ODR AG
  • 4 Jul 2025 · Sogenring 1 · 22 kW · EnBW ODR AG
  • 4 Jul 2025 · Bahnhofstr. 129 · 22 kW · EnBW ODR AG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET