EV charging stations in Nienburg (Weser)
20 public charging sites with 41 charge points are registered in Nienburg (Weser), including 12 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 200 kW.
The largest operator is MER Germany with 13 charge points; 10 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Kleine Drakenburger Str. 7, 31582 Nienburg (Weser)Directions
- Celler Str. 1, 31582 Nienburg (Weser)Directions
- Im Meerbachbogen 2, 31582 Nienburg (Weser)Directions
- Heemser Weg 38, 31582 Nienburg (Weser)Directions
- Göttinger Str. 1, 31582 Nienburg (Weser)Directions
- Kräher Weg 33, 31582 Nienburg (Weser)Directions
- Südring 2, 31582 Nienburg (Weser)Directions
Other charging sites
AC charge points, sorted by number of points.
- Neißestr. 1, 31582 Nienburg (Weser)Directions
- Havelstr. 2, 31582 Nienburg (Weser)Directions
- Nienburger Damm 8, 31582 Nienburg (Weser)Directions
- Nienburger Damm 11, 31582 Nienburg (Weser)Directions
- Dürerring 32, 31582 Nienburg (Weser)Directions
- Dürerring 32, 31582 Nienburg (Weser)Directions
- An der Alpheide 73, 31582 Nienburg (Weser)Directions
- An der Alpheide 73, 31582 Nienburg (Weser)Directions
- Führser Mühlweg 64-68, 31582 Nienburg (Weser)Directions
- Ziegelkampstr. 7a, 31582 Nienburg (Weser)Directions
- Zeisigweg 2, 31582 Nienburg (Weser)Directions
Recently opened
- 1 Apr 2026 · Ziegelkampstr. 7a · 22 kW · MER Germany
- 31 Mar 2025 · Zeisigweg 2 · 11 kW · GLS Mobility GmbH
- 5 Mar 2025 · Havelstr. 2 · 22 kW · MER Germany
- 5 Mar 2025 · An der Alpheide 73 · 22 kW · MER Germany
- 3 Mar 2025 · Dürerring 32 · 22 kW · MER Germany
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Nienburg 51
- Neustadt am Rübenberge 91
- Wunstorf 96
- Sulingen 50
- Verden 63
- Verden (Aller) 31
- Garbsen 150
- Stadthagen 67
- Wedemark 45
- Seelze 44
- Walsrode 125
- Bad Nenndorf 40
Data: official national charge point register (1 September 2026). Data sources