EV charging stations in Pinneberg
31 public charging sites with 57 charge points are registered in Pinneberg, including 23 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Stadtwerke Südholstein GmbH with 18 charge points; 13 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Westring 10, 25421 PinnebergDirections
- Rellinger Str. 47, 25421 PinnebergDirections
- Elmshorner Str. 181, 25421 PinnebergDirections
- Friedrich-Ebert-Str. 54, 25421 PinnebergDirections
- An der Mühlenau 7, 25421 PinnebergDirections
- Saarlandstrasse 65, 25421 PinnebergDirections
- Flensburger Straße 3, 25421 PinnebergDirections
- Fahltskamp 74, 25421 PinnebergDirections
- An d. Mühlenau 3, 25421 PinnebergDirections
Other charging sites
AC charge points, sorted by number of points.
- Elmshorner Str. 0, 25421 PinnebergDirections
- Am Hafen 67, 25421 PinnebergDirections
- Kleiner Reitweg 0, 25421 PinnebergDirections
- Langenkamp 10, 25421 PinnebergDirections
- Moltkestraße 11, 25421 PinnebergDirections
- Clara-Bartram-Weg 16, 25421 PinnebergDirections
- Friedrich-Ebert-Str. 37, 25421 PinnebergDirections
- Fahltskamp 48, 25421 PinnebergDirections
- Fahltskamp 53, 25421 PinnebergDirections
- Rotbuchenkamp 17, 25421 PinnebergDirections
- Voßbarg 53, 25421 PinnebergDirections
Recently opened
- 16 Jul 2026 · Rellinger Str. 47 · 300 kW · Shell Deutschland GmbH
- 1 Jan 2026 · Am Hafen 67 · 22 kW · Stadtwerke Südholstein GmbH
- 3 Sept 2025 · Fahltskamp 48 · 22 kW · Stadtwerke Südholstein GmbH
- 7 Nov 2024 · An der Mühlenau 7 · 75 kW · Autohof Reimers GmbH
- 5 Nov 2024 · Clara-Bartram-Weg 16 · 22 kW · Stadtwerke Südholstein GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Data: official national charge point register (1 September 2026). Data sources