Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Pinneberg · Schleswig-Holstein · Germany

EV charging stations in Schenefeld

18 public charging sites with 33 charge points are registered in Schenefeld, including 12 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is EnBW mobility+ AG und Co.KG with 7 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites18
Charge points33
DC fast points12
150 kW and up8

Charge points by power

≤ 11 kW2
12–22 kW20
23–49 kW0
50–149 kW2
≥ 150 kW9

Operators

EnBW mobility+ AG und Co.KG7
HanseWerk Charging Station6
E.ON Drive GmbH4
Wirelane GmbH4
Autohof Reimers GmbH4
ALDI Nord2
Autohaus Herrmann Kröger GmbH2
VW Ahlfeld2
NWG Charging2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Altonaer Chaussee 81-83, 22869 Schenefeld
    EnBW mobility+ AG und Co.KG150 kW7 pointsCCS, Type 2
    Directions
  • Hauptstr. 58, 22869 Schenefeld
    ALDI Nord150 kW2 pointsCCS24/7
    Directions
  • Kiebitzweg 2, 22869 Schenefeld
    HanseWerk Charging Station50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Altonaer Chaussee 49, 22869 Schenefeld
    Autohof Reimers GmbH22 kW2 pointsCCS, Type 2
    Directions
  • Altonaer Ch 49, 22869 Schenefeld
    Autohof Reimers GmbH22 kW2 pointsCCS, Type 2
    Directions
  • Friedrich-Ebert-Allee 4-12, 22869 Schenefeld
    VW Ahlfeld22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Industriestraße 2, 22869 Schenefeld
    HanseWerk Charging Station22 kW2 pointsType 2
    Directions
  • Holstenplatz 3, 22869 Schenefeld
    HanseWerk Charging Station22 kW2 pointsType 2
    Directions
  • Heisterweg 4, 22869 Schenefeld
    E.ON Drive GmbH22 kW2 pointsType 2
    Directions
  • Dornkamp 9, 22869 Schenefeld
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Lornsenstraße 82, 22869 Schenefeld
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Blankeneser Chaussee 93, 22869 Schenefeld
    Autohaus Herrmann Kröger GmbH22 kW2 pointsType 2
    Directions
  • Osterbrooksweg 35, 22869 Schenefeld
    E.ON Drive GmbH22 kW2 pointsType 2
    Directions
  • Königsberger Str. 58, 22869 Schenefeld
    NWG Charging11 kW2 pointsType 224/7
    Directions

Recently opened

  • 10 Jun 2026 · Hauptstr. 58 · 150 kW · ALDI Nord
  • 30 Mar 2026 · Königsberger Str. 58 · 11 kW · NWG Charging
  • 23 Sept 2025 · Dornkamp 9 · 22 kW · Wirelane GmbH
  • 31 Aug 2025 · Lornsenstraße 82 · 22 kW · Wirelane GmbH
  • 6 Jun 2025 · Altonaer Chaussee 81-83 · 150 kW · EnBW mobility+ AG und Co.KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET