Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Rotenburg (Wümme) · Niedersachsen · Germany

EV charging stations in Sittensen

27 public charging sites with 45 charge points are registered in Sittensen, including 44 DC fast-charging points and 40 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is EnBW mobility+ AG und Co.KG with 12 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites27
Charge points45
DC fast points44
150 kW and up40

Charge points by power

≤ 11 kW1
12–22 kW0
23–49 kW0
50–149 kW4
≥ 150 kW40

Operators

EnBW mobility+ AG und Co.KG12
Shell Deutschland GmbH8
Aral Pulse8
Tesla Germany GmbH8
JET Tankstellen Deutschland GmbH4
EWE Go GmbH4
Börge Hinrichs1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Stader Straße 28, 27419 Sittensen
    EnBW mobility+ AG und Co.KG400 kW12 pointsCCS24/7
    Directions
  • Hansestr. 3, 27419 Sittensen
    Shell Deutschland GmbH300 kW8 pointsCCS
    Directions
  • Stader Straße 30, 27419 Sittensen
    Aral Pulse300 kW8 pointsCCS, CHAdeMO
    Directions
  • Stader Str. 24, 27419 Sittensen
    JET Tankstellen Deutschland GmbH300 kW4 pointsCCS
    Directions
  • Stader Str. 24, 27419 Sittensen
    Tesla Germany GmbH250 kW8 pointsCCS24/7
    Directions
  • Am Sportplatz 3, 27419 Sittensen
    EWE Go GmbH50 kW4 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Wolkenstieg 9, 27419 Sittensen
    Börge Hinrichs11 kW1 pointsType 2
    Directions

Recently opened

  • 21 May 2026 · Stader Straße 28 · 400 kW · EnBW mobility+ AG und Co.KG
  • 29 Oct 2024 · Am Sportplatz 3 · 50 kW · EWE Go GmbH
  • 30 Sept 2024 · Wolkenstieg 9 · 11 kW · Börge Hinrichs
  • 30 May 2024 · Hansestr. 3 · 300 kW · Shell Deutschland GmbH
  • 28 May 2024 · Stader Str. 24 · 250 kW · Tesla Germany GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET