Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Marburg-Biedenkopf · Hessen · Germany

EV charging stations in Stadtallendorf

23 public charging sites with 45 charge points are registered in Stadtallendorf, including 35 DC fast-charging points and 30 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Aral Pulse with 12 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites23
Charge points45
DC fast points35
150 kW and up30

Charge points by power

≤ 11 kW1
12–22 kW8
23–49 kW0
50–149 kW2
≥ 150 kW34

Operators

Aral Pulse12
TEAG Mobil GmbH12
E-Merge Mobility GmbH6
EWE Go GmbH4
E.ON Drive GmbH4
EAM Natur Energie GmbH2
Nau2
Erneuerbare für Marburg-Biedenkopf GmbH & Co. KG2
Jörg Gutendorf1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Daimlerstr. 2, 35260 Stadtallendorf
    Aral Pulse300 kW12 pointsCCS
    Directions
  • Aufbauplatz 2-4, 35260 Stadtallendorf
    E-Merge Mobility GmbH300 kW6 pointsCCS24/7
    Directions
  • Faudi-Str. 3, 35260 Stadtallendorf
    EWE Go GmbH300 kW4 pointsCCS24/7
    Directions
  • Straße des 17. Juni 6, 35260 Stadtallendorf
    TEAG Mobil GmbH225 kW12 pointsCCS24/7
    Directions
  • Niederkleiner Str. 7, 35260 Stadtallendorf
    EAM Natur Energie GmbH50 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Faudi-Str. 1, 35260 Stadtallendorf
    E.ON Drive GmbH22 kW4 pointsType 2
    Directions
  • Marburger Str. 2, 35260 Stadtallendorf
    Nau22 kW2 pointsType 2
    Directions
  • Bahnhofstraße 2, 35260 Stadtallendorf
    Erneuerbare für Marburg-Biedenkopf GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Weilburger Straße 17, 35260 Stadtallendorf
    Jörg Gutendorf11 kW1 pointsType 2
    Directions

Recently opened

  • 6 Dec 2024 · Faudi-Str. 3 · 300 kW · EWE Go GmbH
  • 10 Oct 2024 · Daimlerstr. 2 · 300 kW · Aral Pulse
  • 23 Apr 2024 · Aufbauplatz 2-4 · 300 kW · E-Merge Mobility GmbH
  • 21 Mar 2024 · Straße des 17. Juni 6 · 225 kW · TEAG Mobil GmbH
  • 15 Mar 2023 · Niederkleiner Str. 7 · 50 kW · EAM Natur Energie GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET